ORU LOGIK WL 4/8 ORU MS 2250/1500
Transcript
ORU LOGIK WL 4/8 ORU MS 2250/1500
DIAGRAMMA DI PRODUZIONE / OUTPUT DIAGRAM Composizione impasto per 1,5 m3 Mix composition for 1,5 m3 Inerti - Aggregates 1.800 l Cemento - Cement 600 kg Acqua - Water 220 l Pesatura di 3-4 inerti con 2 spillamenti/inerte Weighing of 3-4 aggregates by drawing twice each one Nastro bilancia da 800 mm (max. portata 266 m3/h - 73 litri/sec) 800 mm weighing conveyor belt (266 m3/h maximum output - 73 l/sec) Coclea di carico diam. 219 mm (portata 13 kg/sec) Loading screw feeder diam. 219 mm (13 kg/sec capacity) 72 m /h - velocità skip 27 m/min - ORU MS 2250/1500 72 m3/h - 27 m/min skip speed - ORU MS 2250/1500 3 Fasi del ciclo - Phases sec A Pesatura inerti - Aggregate weighing 40” B Pesatura cemento - Cement weighing 50” C Pesatura acqua - Water weighing 30” D Caricamento skip inerti - Aggregate loading 25” E Salita skip - Skip rise 20” F Caricamento inerti in mescolatrice - Aggregate loading 10” G Discesa skip - Skip descent 20” 0 60 120 180 240 H Caricamento cemento e acqua - Cement and water loading 15” I Impasto e vuotamento - Mixing and emptying 60” Fasi che determinano il ciclo - Phases that determine the cycle Tempo totale per ciclo - Total time per cycle Cicli ora - Cycles per hour Cicli continui - Continuous running D+E+F+G 75” Produzione m3/h - m3/h output 48 72 78 m3/h - velocità skip 33 m/min - ORU MS 2250/1500S 78 m3/h - 33 m/min skip speed - ORU MS 2250/1500S Fasi del ciclo - Phases sec A Pesatura inerti - Aggregate weighing 40” B Pesatura cemento - Cement weighing 50” C Pesatura acqua - Water weighing 30” D Caricamento skip inerti - Aggregate loading 25” E Salita skip - Skip rise 16” F Caricamento inerti in mescolatrice - Aggregate loading 10” G Discesa skip - Skip descent 18” 0 60 120 180 240 L’ ORU LOGIK WET è un impianto orizzontale costituito da due monoblocchi premontati: il gruppo di stoccaggio inerti ed il gruppo di miscelazione. Il gruppo di stoccaggio si caratterizza per: - nastro e tramoggia di pesatura inclinati per tenere più basso possibile il punto di carico delle tramogge inerti al fine di eliminare o contenere al massimo le opere di scavo - monoblocco premontato che facilita e riduce notevolmente i tempi di installazione in cantiere - modularità e compattezza per essere facilmente trasportato su bilici di dimensioni standard. H Caricamento cemento e acqua - Cement and water loading 15” Impasto e vuotamento - Mixing and emptying Fasi che determinano il ciclo - Phases that determine the cycle Tempo totale per ciclo - Total time per cycle Cicli ora - Cycles per hour Cicli continui - Continuous running Il gruppo di miscelazione ORU MS DAY è il cuore dell’impianto ed è costituito da: - Un telaio realizzato in robuste travi d’acciaio che assieme ai binari con lo skip, alla cabina del quadro elettrico, al mescolatore, alle bilance acqua e cemento formano un unico monoblocco. - Lo skip con forma geometrica particolare dotato di sistemi deflettori rotanti che consentono di avere un’ampia superficie per l’ingresso degli inerti. Tali deflettori a sua volta si chiudono durante la salita dello skip evitando la fuoriuscita di materiale. Lo scarico avviene nella parte inferiore dello skip tramite una semplice portella a ribaltamento: in questa fase lo skip si trova in posizione verticale consentendo uno scarico rapido anche in presenza di materiali compatti ed umidi senza lasciare residui all’interno. - La bilancia cemento e la bilancia acqua sostenute da una supporto incernierato nella parte anteriore della struttura. - Mescolatore Planetario ORU MS 2250/1500 o 2250/2500S. - Quadro di potenza è installato in un vano della struttura di sostegno e protetto da un carter in lamiera. 45” D+E+F+G 69” 52 Produzione m3/h - m3/h output 78 SISTEMI DI GESTIONE / MANAGEMENT UNITS IU98 CS90V The ORU LOGIK WET is the horizontal batching plant composed of two pre-assembled monoblocs: the aggregate storage group and the mixing group. The aggregate storage group is characterized by: - the conveyor belt and the weighing hopper are inclined to keep as low as possible the loading point of the aggregate hoppers, avoiding excavation works - pre-assembled monobloc that reduces slightly the times of installation of the plant on site - modularity and compactness be loaded on standard trucks. Le Officine Riunite - Udine S.p.A. Concrete Machinery Division Via S. Caterina, 35 - 33030 Basaldella di Campoformido (UD) Società soggetta a direz. e coord. della IMER International S.p.A. Tel. +39 0432 563911 - Fax +39 0432 562131 E-mail: [email protected] · www.imergroup.com Le Officine Riunite - Udine S.p.A. si riservano il diritto di variare senza preavviso i dati esposti quando vi siano giustificati motivi. I dati e le misure non sono quindi da ritenersi impegnativi. Le illustrazioni possono contenere accessori e quindi non conformi alle versioni standard delle macchine. Le Officine Riunite - Udine S.p.A. reserve the right to change the information contained herein without prior notice when they consider it justified. The data and dimensions are therefore not to be considered as binding. The illustrations may include accessories and therefore they could be slightly different from the standard versions of the equipment. ED. 01/2006 I The ORU MS DAY mixing group is composed of: - A frame made of heavy-duty steel beams which together with the rails for the skip, the electrical panel booth, the mixer and the water and cement weighing hoppers form a single monobloc. - The skip with a particular geometry fitted with rotary deflectors that allow a large area for admitting the aggregates. These deflectors in turn close when the skip rises preventing the material from falling out. Unloading takes place in the lower part of the skip through a simple tilting hatch: during this stage the skip is in the vertical position, allowing quick unloading also in the presence of compact and wet materials without leaving remains inside. - The cement weighing hopper and the water weighing hopper rest on a support structure hinged to the front part of the mixing group. - ORU MS 2250/1500 or 2250/2500S Planetary Mixers. - Control panel installed in a recess of the support structure and protected by a sheet metal case. ORU LOGIK WL 4/8 ORU MS 2250/1500 - DAY 72 m3/h ORU LOGIK WL 4/8 ORU MS 2250/1500S - DAY 78 m3/h MESCOLATRICE ORU MIXER ORU MS 2250/1500 ORU MS 2250/1500S CAVALLETTO completo di scala, praticabile e quadro di potenza TRESTLE complete with stairs, walkway and control panel Altezza di scarico - Discharging height BILANCIA CEMENTO CEMENT WEIGHING HOPPER Portata massima - Maximum capacity Vasca (volume acqua) Hopper (water volume) Vibratore - Vibrator BILANCIA ACQUA WATER WEIGHING HOPPER Capacità - Capacity Portata - Capacity SKIP - SKIP Capacità - Capacity Portata - Capacity 4.100 mm Mod. B600 900 Kg 735 l Pneumatico Pneumatic Mod. BA500 520 l 550 Kg Mod. 2250/1500 Mod. 2250/1500S 2.598 l 3.300 Kg LAYOUT DIMENSIONI / DIMENSIONS L B LAYOUT A C D 4.060 M H A 26.000 LAYOUT B ORU LOGIK WL 4/8 - ORU MS DAY Caratteristiche - Main characteristics Nastro bilancia - Weighing conveyor belt Coclea di carico - Loading screw feeder Bilancia inerti - Aggregate weighing hopper Bocchette dosaggio - Discharge gates Max potenza installata - Max installed power H(m) 0 1 2 A(mm) 2.800 3.130 3.130 B(mm) 2.960 3.290 3.290 C(mm) 2.960 3.290 3.290 L D(mm) 2.800 3.130 3.130 L(mm) 11.700 13.000 13.000 26.000 Stoccaggio (m3) - Storage (m3) 80 130 180 9,5x0,8 m 8.000x219 mm 5.000 kg 4 97 kW M(mm) 5.760 6.760 7.760 2.000 4.001 L 4.140 4.001 4.140