ORU LOGIK WL 4/8 ORU MS 2250/1500

Transcript

ORU LOGIK WL 4/8 ORU MS 2250/1500
DIAGRAMMA DI PRODUZIONE / OUTPUT DIAGRAM
Composizione impasto per 1,5 m3
Mix composition for 1,5 m3
Inerti - Aggregates
1.800 l
Cemento - Cement
600 kg
Acqua - Water
220 l
Pesatura di 3-4 inerti con 2 spillamenti/inerte
Weighing of 3-4 aggregates by drawing twice each one
Nastro bilancia da 800 mm (max. portata 266 m3/h - 73 litri/sec)
800 mm weighing conveyor belt (266 m3/h maximum output - 73 l/sec)
Coclea di carico diam. 219 mm (portata 13 kg/sec)
Loading screw feeder diam. 219 mm (13 kg/sec capacity)
72 m /h - velocità skip 27 m/min - ORU MS 2250/1500
72 m3/h - 27 m/min skip speed - ORU MS 2250/1500
3
Fasi del ciclo - Phases
sec
A Pesatura inerti - Aggregate weighing
40”
B Pesatura cemento - Cement weighing
50”
C Pesatura acqua - Water weighing
30”
D Caricamento skip inerti - Aggregate loading
25”
E Salita skip - Skip rise
20”
F Caricamento inerti in mescolatrice - Aggregate loading
10”
G Discesa skip - Skip descent
20”
0
60
120
180
240
H Caricamento cemento e acqua - Cement and water loading 15”
I
Impasto e vuotamento - Mixing and emptying
60”
Fasi che determinano il ciclo - Phases that determine the cycle Tempo totale per ciclo - Total time per cycle Cicli ora - Cycles per hour
Cicli continui - Continuous running
D+E+F+G
75”
Produzione m3/h - m3/h output
48
72
78 m3/h - velocità skip 33 m/min - ORU MS 2250/1500S
78 m3/h - 33 m/min skip speed - ORU MS 2250/1500S
Fasi del ciclo - Phases
sec
A Pesatura inerti - Aggregate weighing
40”
B Pesatura cemento - Cement weighing
50”
C Pesatura acqua - Water weighing
30”
D Caricamento skip inerti - Aggregate loading
25”
E Salita skip - Skip rise
16”
F Caricamento inerti in mescolatrice - Aggregate loading
10”
G Discesa skip - Skip descent
18”
0
60
120
180
240
L’ ORU LOGIK WET è un impianto orizzontale costituito da due monoblocchi premontati:
il gruppo di stoccaggio inerti ed il gruppo di miscelazione.
Il gruppo di stoccaggio si caratterizza per:
- nastro e tramoggia di pesatura inclinati per tenere più basso possibile il punto di carico delle
tramogge inerti al fine di eliminare o contenere al massimo le opere di scavo
- monoblocco premontato che facilita e riduce notevolmente i tempi di installazione in cantiere
- modularità e compattezza per essere facilmente trasportato su bilici di dimensioni standard.
H Caricamento cemento e acqua - Cement and water loading 15”
Impasto e vuotamento - Mixing and emptying
Fasi che determinano il ciclo - Phases that determine the cycle Tempo totale per ciclo - Total time per cycle Cicli ora - Cycles per hour
Cicli continui - Continuous running
Il gruppo di miscelazione ORU MS DAY è il cuore dell’impianto ed è costituito da:
- Un telaio realizzato in robuste travi d’acciaio che assieme ai binari con lo skip, alla cabina del quadro
elettrico, al mescolatore, alle bilance acqua e cemento formano un unico monoblocco.
- Lo skip con forma geometrica particolare dotato di sistemi deflettori rotanti che consentono di avere
un’ampia superficie per l’ingresso degli inerti. Tali deflettori a sua volta si chiudono durante la salita
dello skip evitando la fuoriuscita di materiale. Lo scarico avviene nella parte inferiore dello skip
tramite una semplice portella a ribaltamento: in questa fase lo skip si trova in posizione verticale
consentendo uno scarico rapido anche in presenza di materiali compatti ed umidi senza lasciare
residui all’interno.
- La bilancia cemento e la bilancia acqua sostenute da una supporto incernierato nella parte
anteriore della struttura.
- Mescolatore Planetario ORU MS 2250/1500 o 2250/2500S.
- Quadro di potenza è installato in un vano della struttura di sostegno e protetto da un carter in lamiera.
45”
D+E+F+G
69”
52
Produzione m3/h - m3/h output
78
SISTEMI DI GESTIONE / MANAGEMENT UNITS
IU98
CS90V
The ORU LOGIK WET is the horizontal batching plant composed of two pre-assembled monoblocs:
the aggregate storage group and the mixing group.
The aggregate storage group is characterized by:
- the conveyor belt and the weighing hopper are inclined to keep as low as possible the loading
point of the aggregate hoppers, avoiding excavation works
- pre-assembled monobloc that reduces slightly the times of installation of the plant on site
- modularity and compactness be loaded on standard trucks.
Le Officine Riunite - Udine S.p.A.
Concrete Machinery Division
Via S. Caterina, 35 - 33030 Basaldella di Campoformido (UD)
Società soggetta a direz. e coord. della IMER International S.p.A.
Tel. +39 0432 563911 - Fax +39 0432 562131
E-mail: [email protected] · www.imergroup.com
Le Officine Riunite - Udine S.p.A. si riservano il diritto di variare senza preavviso i dati esposti quando
vi siano giustificati motivi. I dati e le misure non sono quindi da ritenersi impegnativi.
Le illustrazioni possono contenere accessori e quindi non conformi alle versioni standard delle macchine.
Le Officine Riunite - Udine S.p.A. reserve the right to change the information contained herein
without prior notice when they consider it justified. The data and dimensions are therefore not
to be considered as binding. The illustrations may include accessories and therefore they could
be slightly different from the standard versions of the equipment.
ED. 01/2006
I
The ORU MS DAY mixing group is composed of:
- A frame made of heavy-duty steel beams which together with the rails for the skip, the electrical panel
booth, the mixer and the water and cement weighing hoppers form a single monobloc.
- The skip with a particular geometry fitted with rotary deflectors that allow a large area for admitting
the aggregates. These deflectors in turn close when the skip rises preventing the material from falling out.
Unloading takes place in the lower part of the skip through a simple tilting hatch: during this stage
the skip is in the vertical position, allowing quick unloading also in the presence of compact and wet
materials without leaving remains inside.
- The cement weighing hopper and the water weighing hopper rest on a support structure hinged
to the front part of the mixing group.
- ORU MS 2250/1500 or 2250/2500S Planetary Mixers.
- Control panel installed in a recess of the support structure and protected by a sheet metal case.
ORU LOGIK WL 4/8
ORU MS 2250/1500 - DAY
72 m3/h
ORU LOGIK WL 4/8
ORU MS 2250/1500S - DAY
78 m3/h
MESCOLATRICE
ORU MIXER
ORU MS 2250/1500
ORU MS 2250/1500S
CAVALLETTO completo di scala,
praticabile e quadro di potenza
TRESTLE complete with stairs,
walkway and control panel
Altezza di scarico - Discharging height
BILANCIA CEMENTO
CEMENT WEIGHING HOPPER
Portata massima - Maximum capacity
Vasca (volume acqua)
Hopper (water volume)
Vibratore - Vibrator
BILANCIA ACQUA
WATER WEIGHING HOPPER
Capacità - Capacity
Portata - Capacity
SKIP - SKIP
Capacità - Capacity
Portata - Capacity
4.100 mm
Mod. B600
900 Kg
735 l
Pneumatico
Pneumatic
Mod. BA500
520 l
550 Kg
Mod. 2250/1500
Mod. 2250/1500S
2.598 l
3.300 Kg
LAYOUT
DIMENSIONI / DIMENSIONS
L
B
LAYOUT A
C
D
4.060
M
H
A
26.000
LAYOUT B
ORU LOGIK WL 4/8 - ORU MS DAY
Caratteristiche - Main characteristics
Nastro bilancia - Weighing conveyor belt
Coclea di carico - Loading screw feeder
Bilancia inerti - Aggregate weighing hopper
Bocchette dosaggio - Discharge gates
Max potenza installata - Max installed power
H(m)
0
1
2
A(mm)
2.800
3.130
3.130
B(mm)
2.960
3.290
3.290
C(mm)
2.960
3.290
3.290
L
D(mm)
2.800
3.130
3.130
L(mm)
11.700
13.000
13.000
26.000
Stoccaggio (m3) - Storage (m3)
80
130
180
9,5x0,8 m
8.000x219 mm
5.000 kg
4
97 kW
M(mm)
5.760
6.760
7.760
2.000
4.001
L
4.140
4.001
4.140