The Langham, Hong Kong

Transcript

The Langham, Hong Kong
Caso di successo
The Langham, Hong Kong
(Hong Kong)
Profilo del cliente
Langham Place is a business and commercial complex which opened in the fourth quarter of 2004 in Hong Kong,
comprising a shopping mall, hotel and office tower. Located in the Mong Kok district of Kowloon, the complex occupies
two entire blocks defined by Argyle Street, Portland Street, Shantung Street and Reclamation Street. Shanghai Street
separates the hotel and office tower from the shopping mall.
The complex was the result of an urban renewal project under Land Development Corporation, later known as Urban
Renewal Authority (URA). The project is to cleanse and modernise a dilapidated area of Kowloon previously known as a
red light district, especially Portland Street.
The HK$10 billion project is a 50:50 joint development by the Great Eagle Group and the Urban Renewal Authority
("URA") of Hong Kong[2], to provide a modern and comfortable commercial space in the heart of Mong Kok.
The Langham Place Hotel is located at 555, Shanghai Street. Managed by the Langham Hotels International, it is the only
5 star hotel located in Mong Kok. Its 42 floors house 665 guest rooms, of which 280 "deluxe", 284 "executive", and 101
"Langham Hotel Club" rooms.
Pre-eminent among Hong Kong hotels, The Langham Hong Kong presents a refined European-style haven in the heart of
the bustling Tsimshatsui shopping and tourism district.
With gracious charm and polished five star luxury, Langham Hotel Hong Kong is the only Hong Kong hotel that can claim
the legendary heritage of the original grand hotel.
The Langham Hotel Hong Kong is a member of 'The Leading Hotels of the World'
Obiettivi del cliente
Th objective was to create a five star hotel experience which would differentiate from the other hotels from this area.
Vantaggi per il cliente
- Advanced customer experience,
- Differentiation versus competition.
Testimonianze di clienti (testuali)
'I would definitely EPIC to other hotels. The reason behind is the reliability and the after sales service which is excellent in
this industry'
Erol Wong, Langham Hotel Chief Engineer
Metodologia di implementazione
The first phase has been the definition with the customer of the functionalities in the guestroom.
It has then been validated through the implementation of the solution in the Mock-up room.
Once confirmed, the solution has been deployed in all the rooms.
Durata
Project design started in 2003 and was implemented in 2004.
In che modo abbiamo calcolato il risparmio energetico?
10% of energy savings on the electrical bill of the guestroom
For the Guest, the room control increases the level of comfort inside the room :
- ability to have a central point of control, on the bed side for example,
- direct access to selected lighting scene,
- no need to worry about turning off each light when leaving the room or going to sleep.
For the Operator, the impact is both on Guest satisfaction and energy efficiency - It allows to reduce the lighting and
HVAC when the guest is away, knowing that a change of 1 degree in the room allows saving 3% of the energy bill of the
HVAC system
Valori che differenziano Schneider Electric rispetto ai concorrenti
- Advanced lighting solution with design products,
- High-end solution for multimedi-connectivity
- Reliability and after-sales.
www.schneider-electric.com
1 /2
Caso di successo
Quadro generale delle soluzioni
www.schneider-electric.com
2 /2