complete works - Studio Corona
Transcript
complete works - Studio Corona
civil engineering 2012 STUDIO CORONA INDICE / INDEX PROFILO SOCIETARIO / COMPANY PROFILE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 LO STAFF / STAFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 SISTEMI INFORMATICI / IT EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 BROCHURE / BROCHURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 LOTTI AUTOSTRADALI / MOTORWAY LOTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 LOTTI STRADALI / ROAD LOTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 GALLERIE / TUNNELING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 OPERE FERROVIARIE / RAILROAD LOTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 COMMESSE INTERNAZIONALI / INTERNATIONAL WORKS . . . . . . . . . . . . . . . . . . . . . . 54 CENTRALI NUCLEARI / NUCLEAR POWER STATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 DIREZIONE LAVORI / SUPERVISION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 EDIFICI CIVILI / CIVIL BUILDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 LAVORI SPECIALI / SPECIAL WORKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64 Realizzazione grafica: Via Marco Polo, 1 10129 Torino tel. 011/5817227 fax 011/503119 [email protected] Stampa: T I P O L I T O G R A F I A Via Saluzzo, 64/d 10125 Torino tel. / fax 011 650 72 97 [email protected] PROFILO SOCIETARIO L'Ing. Giovanni Corona, dopo la laurea nel 1953 ed un periodo di permanenza al Politecnico di Torino come assistente del Prof. Levi, si è dedicato alla libera professione associandosi dopo pochi anni con l'Ing. Renzo Perazzone. Fin dal 1962 è iniziata la collaborazione professionale con gli attuali Ingg. Seniores G. Graffi, P.A. Genovesio e G. Mottino nel campo della progettazione generale e strutturale di grandi opere dell'ingegneria civile. Nel 1973 costituisce con l'Ing. Perazzone la Società S.I.C. - STUDIO DI INGEGNERIA CIVILE - per meglio coordinare e sviluppare l'attività svolta sempre mantenendo unito il gruppo di progettisti originari. Nel 1993 nasce l'associazione professionale denominata STUDIO CORONA, ne fanno parte gli Ingg. G. Corona, G. Graffi, P.A. Genovesio e G. Mottino e alcuni Ingg. Juniores già da tempo operanti nello Studio e che avevano ormai acquisito una buona esperienza di progettazione. Con la costituzione dello Studio Corona la Società S.I.C. ha quindi assunto la funzione di fornire allo Studio il necessario supporto tecnico di personale e attrezzature indispensabili allo sviluppo degli incarichi professionali. Nel 2004 lo Studio Corona snc e la Società S.I.C. convergono nello Studio Corona S.r.l. Civil Engineering che mantiene inalterate sia le caratteristiche tecniche che lo staff di progettisti e disegnatori garantendone così la continuità della professionalità che ha distinto la struttura tecnica sin dal 1973. Non trascurando la progettazione generale di opere per vari committenti ed amministrazioni pubbliche, caratteristica peculiare e preponderante dello Studio è sempre stata quella di redigere i definitivi progetti strutturali costruttivi per la effettiva realizzazione delle opere su incarico delle Imprese appaltatrici dei lavori. Anche al di fuori di veri e propri incarichi di Direzione dei Lavori, lo Studio assicura ai propri committenti un'assidua assistenza ai cantieri, sia per una corretta interpretazione degli elaborati progettuali sia per gli eventuali adattamenti che possono sorgere in conseguenza della complessità delle opere e da specifiche situazioni locali. A partire dai primi anni del secolo lo Studio Corona ha anche aperto delle filiali in Senegal, Nigeria, Algeria, Sudan, Kazakistan e Romania dove tutt’ora opera sempre nella progettazione di grandi infrastrutture. STUDIO CORONA 5 COMPANY PROFILE In 1953, after graduating in Engineering at the “Politecnico of Torino”, Giovanni Corona started his working career as assistant of Prof. Levi at the same university and after an experience as a free-lance, he teamed up with Renzo Perazzone. He has worked in general engineering and civil engineering structural projects with G. Graffi, P.A. Genovesio and G. Mottino since 1962 . In 1973 Renzo Perazzone founded Società S.I.C. - STUDIO OF INGEGNERIA CIVILE, with the aim of better coordinating and developing the activities carried out as well as keeping together the original team of expert engineers. In 1993, G. Corona, G. Graffi, P.A. Genovesio and G. Mottino together with some junior engineers, who had acquired expertise over the years, founded a professional association called STUDIO CORONA. In 2004, Studio Corona snc and Società S.I.C. merged in Studio Corona S.r.l. Civil Engineering, keeping unaltered both the technical characteristics and the engineering and designing staff, thus guaranteeing continuity in the professionalism that has always characterized the organization right from its origin in 1973. Without neglecting the general engineering for various contractors and public administrations, a distinctive feature of the Company has always been that of drawing up final construction structural projects on behalf of the contractors. Over and above project management tasks, the Company guarantees to constant assistance in the building sites to achieve to correct interpretation of project details and of any possible modifications that might be necessary due to the complexity of the work or specific local situations. At the beginning of this century, Studio Corona opened some branches in Senegal, Nigeria, Algeria, Sudan, Kazakhstan and Romania working in the engineering and design of important infrastructures. STUDIO CORONA 7 STAFF PLANNING EXECUTIVES 8 Managing Director Ing. Pietro Corona 1987 Technical Manager Ing. Giuseppe Graffi 1962 Project Manager Ing. Pierantonio Genovesio 1967 Project Manager Ing.Giorgio Mottino 1968 R.&D. Manager Ing. Antonio Segreto 1976 Civil Engineer Ing. Paola Varello 1977 Civil Engineer Ing. Claudio Astrua 1979 Geotechnichal Engineer Ing. Renato Vaira 1981 Quality Manager Arch. Luisa Corona 1986 Geotechnical Engineer Ing. Gianfranco Sodero 1986 Safety Manager Ing. Eugenio Marro 1987 Hydraulical Engineer Ing. Luca Perazzone 1987 ASSISTANTS Ing. Michele Motta 1990 Ing. Guido Mottino 1999 Ing. Francesco Fumarola 2000 Ing. Ivan Collino 2000 TECHNICAL STAFF n. 20 ADMINISTRATIVE STAFF n. 5 STUDIO CORONA 9 SISTEMI INFORMATICI / IT EQUIPMENT ATTREZZATURE HARDWARE • Rete Ethernet 100/1000 Mbit/sec (circa 30 utenti) connessa a INTERNET tramite router ADSL; • 1 Ethernet Disk LaCie Gigabit, 1TB; • 1 File Server INTERCOMP IDAS 2000 con sistema operativo Windows 2003 Server, archivio RAID/5 da 4500 GB; • 8 Workstations HP con sistema operativo Windows XP e Windows 7, video da 19”/24” per progettazione CAD e stradale; • 4 Personal Computer HP con sistema operativo Windows XP, video da 17”/19” per progettazione strutturale, geotecnica, cantieristica, software; • 5 Personal computer HP con sistema operativo Windows XP, video da 17” per Office Automation e contabilità aziendale; • 10 Calcolatori portatili HP/ACER/TOSHIBA, video da 15.4”/17” con sistema operativo Windows XP; • Plotter laser A0 Ocè PlotWave 300; • Plotter A0 a getto d’inchiostro a colori Ocè TCS 500; • 2 Copiatrici multifunzione (copiatrice/stampante/scanner) Infotec a colori, formato A4/A3; • 2 Stampanti laser HP, formato A4; • 1 Stampanti a getto d’inchiostro HP a colori, formato A4/A3; • Fotocamera digitale Nikon Coolpix 995; • 1 Gruppi di continuità da 10 KW Merlin-Gerin. ATTREZZATURE SOFTWARE a) CAD (Computer Aided Design) • AUTOCAD (Autodesk): programma di grafica interattiva 2D/3D (3 licenze AutoCAD Full, 14 licenze AutoCAD LT). • ALLPLAN (Nemetschek): programma di grafica interattiva 2D/3D specialmente orientato verso la progettazione civile, con moduli aggiuntivi per la disegnazione automatica e il computo delle armature in c.a. (3 licenze). b) Progettazione stradale • CIVIL DESIGN (DigiCorp Ingegneria): programma per la progettazione interattiva di strade, ferrovie e acquedotti/fognature: consente l’acquisizione e gestione di dati topografici e immagini raster, la gestione contemporanea di più assi e relativi solidi, stradali e non; la realizzazione automatica interattiva di planimetrie, profili longitudinali, sezioni trasversali, computi, prospettive in rendering, segnaletica stradale, inserimenti ambientali (2 licenze). 10 HARDWARE EQUIPMENT • Ethernet 10/100 Mbit/sec (about 30 users) connected to Internet through ADSL Router • 1 Ethernet Disk LaCie Gigabit, 1TB • 1 INTERCOMP IDAS 2000 File Server with Windows 2003 Server operating system, 4500 GB RAID/5 archive • 8 HP workstations with Windows XP and Windows 7 operating system, 19”/24” screen for CAD and road design • 4 HP PCs with Windows XP operating system, 17”/19” screens for structural, geotechnical and field design software • 5 HP PCs with Windows XP operating system, 17” screens for Office Automation and company accounting • 10 HP/ACER/TOSHIBA laptops with 15,4”/17” screens • A0 Ocè PlotWave 300 laser plotter • Ocè TCS 500 color ink-jet A0 plotter • 2 Infotec A4/A3 color multi-function copiers (copier/printer/scanner) • 2 HP laser printers, A4 format • 1 A4/A3 color HP ink-jet printer • Nikon Coolpix 995 digital camera • 1 10 KW Merlin - Gerin UPS SOFTWARE EQUIPMENT a) CAD (Computer Aided Design) • AutoCAD (Autodesk): 2D/3D design software (3 full AutoCAD licences, 14 LT AutoCAD licences). • ALLPLAN FT (Nemetschek): interactive architectural software for building design and drawing process with modules for automatic design of concrete reinforcements (3 licences). b) Road Design • CIVIL DESIGN (DigiCorp Engineering): software for interactive design of roads, railways, aqueducts, sewerages. It allows to operate and, at the same time, to retrieve topographical data, raster images, axes and solids. Moreover, it allows to get interactive automatic execution of layouts, longitudinal profiles, computing, projections in rendering, streets signs, environmental settings (2 licences). STUDIO CORONA 11 SISTEMI INFORMATICI / IT EQUIPMENT c) Progettazione strutturale • MIDAS/Civil: programma di calcolo ad elementi finiti per l’analisi bi-tridimensionale in campo statico e dinamico, lineare e non lineare. Funzionalità avanzate per i ponti a più campate: analisi per fasi costruttive, generazione automatica carichi mobili, ponti in c.a.p. e acciaio, ponti strallati, ponti sospesi. Modelli ad elementi finiti di tipo solid, truss, beam, shell. Leggi costitutive per qualsiasi materiale (metalli, terreno/rocce, c.a., plastiche). Soluzione di problemi buckling, di contatto, pushover a fibre, elasto-plastici, viscosi, analisi spettrale e vibrazionale nel tempo. Provvisto di pre-post processore per l’input/output grafico interattivo (1 licenza). • MIDAS/Gen: programma di calcolo ad elementi finiti per l’analisi bi-tridimensionale in campo statico e dinamico, lineare e non lineare. Analisi per fasi costruttive, generazione automatica carichi mobili. Modelli ad elementi finiti di tipo solid, truss, beam, shell. Leggi costitutive per qualsiasi materiale (metalli, terreno/rocce, c.a., plastiche). Soluzione di problemi buckling, di contatto, pushover a fibre, elasto-plastici, viscosi, analisi spettrale e vibrazionale nel tempo. Provvisto di pre-post processore per l’input/output grafico interattivo (1 licenza). • XFINEST (Ce.A.S.): programma di calcolo ad elementi finiti per l’analisi bi-tridimensionale in campo statico e dinamico. Modelli ad elementi finiti di tipo solid da 8 a 27 nodi, truss, beam, shell. Provvisto di pre-post processore per l’input/output grafico interattivo (2 licenze). • MODEST (TecniSoft): pre-post processore di programmi ad elementi finiti (XFINEST) orientato alla progettazione civile. Disegno automatico di carpenterie ed armature in c.a.. Verifica di strutture metalliche e dei relativi nodi di congiunzione con il modulo PNAR (1 licenza). • TRAVILOG (Logical Soft): progetto e verifica sezioni in c.a. e miste, T.A./S.L.E./S.L.U.; verifica al fuoco. • Impalcati (Studio CORONA): programma per il calcolo e le verifiche di ponti in c.a.p. in opera, a travi o prefabbricati a conci, anche continui a più luci e con vincoli o sezione variabile qualsiasi. • Muri di sostegno (Studio CORONA): programma per la verifica di muri in c.a. e a gravità, in opera o prefabbricati, di sostegno o sottoscarpa/controripa, con fondazione diretta o su pali. • Gallerie (Studio CORONA): programma per la verifica di gallerie naturali o artificiali. • Pozzi (Studio CORONA): programma per la verifica di pozzi di fondazione immersi in un mezzo elastoplastico, anche intirantati. • Tombini (Studio CORONA): programma per la verifica di tombini scatolari. • Vari programmi, realizzati dallo Studio CORONA, per il calcolo e la verifica di: strutture intelaiate, travi continue e su suolo elastico, pile e spalle da ponte, ponti a travi in c.a.p., palificate di fondazione, pressoflessione deviata di sezioni qualsiasi. d) Progettazione geotecnica-strutturale • FLAC 2D (Itasca): programma di calcolo alle differenze finite con orientamento geotecnico; permette di schematizzare e risolvere praticamente qualsiasi problema geotecnico bidimensionale, ad esempio: stabilità di pendii, gallerie naturali e artificiali, calcolo di cedimenti, problemi di filtrazione, problemi dinamici e di contatto. I materiali possono avere qualsiasi legge costitutiva elastica o elastoplastica e qualsiasi criterio di rottura. Si possono schematizzare strutture in elementi truss, beam, pile (pali) e cable (tiranti o cavi), tenendo conto delle non linearità di materiali e dei fenomeni di 2° ordine (1 licenza). • PARATIE Plus (Ce.A.S.): programma di calcolo elastoplastico ad elementi finiti volto alla verifica di paratie multitirantate. Qualsiasi numero di tiranti e strati terreno; possono essere analizzate paratie isolate o doppie, collegate da puntoni o solette. Possibilità di variazione delle caratteristiche del terreno nelle fasi successive di realizzazione. Opzioni di nascita/rimozione degli elementi costruttivi (tiranti, puntoni, solette, paratie). Carichi nastriformi, di superficie, interrati oppure curve di carico dirette sul diaframma. Modello costitutivo del terreno estremamente avanzato: è in grado di tener conto della “storia” di carico, differente in fase di carico vergine o ricarico successivo e del comportamento a rottura. Simulazione di effetti di filtrazione stazionaria in mezzo non omogeneo (2 licenze). e) Contabilità, computi metrici • PriMus Unico (ACCA software) f) Office automation • 15 licenze Microsoft Office Professional: suite di programmi per l’editing di testi (WORD), la stesura di tabelle (EXCEL), la presentazione (POWERPOINT) e la gestione di data-base (ACCESS). • 1 licenza CorelDRAW: suite di programmi per la grafica vettoriale (CorelDRAW), la gestione di immagini (PhotoPAINT), l’acquisizione di testi o disegni da scanner (CorelTRACE), l’animazione (R.A.V.E.). • 8 licenze ADOBE ACROBAT: creazione e gestione documenti interscambiabili tra varie piattaforme. • 1 licenza Microsoft Project: gestione cronoprogrammi. Fanno anche parte del materiale utilizzato per la prestazione del servizio i seguenti documenti: • documentazione generale (composta da libri, cataloghi, estratti da pubblicazioni, esempi di progetti o di tecnologie, materiale didattico acquisito durante la frequentazione di corsi o congressi); • riviste specialistiche e normativa. 12 In merito alle misure adottate per garantire la qualità, come da indicazioni di cui all’art. 14 c. 1 let. e del D.Lgs. 157/95, si dettaglia che tutta questa documentazione viene selezionata dai rispettivi responsabili di funzione che sono professionisti di provata esperienza e capacità, registrata, archiviata, aggiornata e distribuita dai rispettivi responsabili di archivio sui database e negli appositi archivi. Le procedure che garantiscono la qualità di attrezzature e strumenti sono quelle che riguardano: • l’approvvigionamento con il controllo e l’aggiornamento degli acquisti ed la verifica sul prodotto interno eseguendo test sui software; • l’addestramento all’uso di tutta la le attrezzature e strumenti in possesso dallo studio tramite pianificazione ed attuazione di corsi interni ed esterni di formazione; • la salvaguardia dei dati (back up), del software (antivirus), dell’hardware (assistenza) e il costante controllo della documentazione di riferimento (normativa, regolamenti, e documentazione tecnica). c) Structural Design • MIDAS/Civil: finite elements software for three-dimensional analyses, statics and dynamics, linear and non. Advanced features for bridge spans: analysis for constructive phases, automatic generation of mobile loads, c.a.p. and iron bridges, cable-stayed and suspension bridges. Solid, truss, beam and shell finite elements type models. Constitutive models for any materials (metal, soil/rock, ca, plastic). Solution of: buckling contacts, fibre pushover, elastic-plastic, viscose, spectral and vibration analyses. Equipped with pre-post processor for interactive graphic input/output (1 licence). • MIDAS/Gen: finite elements software for three-dimensional analyses, static and dynamic, linear and non. Analysis for constructive phases, automatic generation of mobile loads. Finite solid elements, truss, beam, pipe, shell. Constitutive models for any materials (metal, soil/rock, ca, plastic). Solution of: buckling contacts, fibre pushover, elastic-plastic, viscose, spectral and vibration analyses. Equipped with pre-post processor for interactive graphic input/output (1 licence). • XFINEST (Ce.A.S.): Finite elements software for two/three-dimensional analyses, statics and dynamics. Finite solid elements 8 to 27 nodes, truss, beam, pipe, shell. Equipped with pre-post processor for interactive graphic input/output (2 licenses). • MODEST (TecniSoft): Pre - post processor for finite elements software (XFINEST) for Civil Design. Automatic drawing of framing and concrete reinforcements. Analysis of metallic structures and relevant nodes of junction with PNAR module (1 licence). • TRAVILOG (Logical Soft): design and analysis of sections in c.a. and mixed, T.A./S.L.E./S.L.U; fire analysis. • Deck (Studio CORONA): software for designing and checking reinforced concrete bridges, slab, precast segmental PSC bridges continuous span also or with variable section. • Retaining walls (Studio CORONA): Software for checking concrete and gravity walls in situ or precast, retaining, scarp wall, with direct foundation or on pile foundation. • Galleries (Studio CORONA): software for checking natural or artificial galleries. • Drilled piers (Studio CORONA): software for checking drilled piers sunk in elasto-plastic material, even if anchored. • Culverts (Studio CORONA): software for checking of culverts. • Various software programs designed by Studio Corona to analyse and calculate: frame structures, continuous and elastic ground beam, pier, abutments walls, underpinning foundations, deviated eccentric axial force on any sections. d) Geotechnical and structural Design • FLAC 2D (Itasca): finite difference software with geotechnical orientation; it allows to schematize and solve every geotechnical two-dimensional problem, such as: fall stability, natural and artificial galleries, sagging calculus, filtering problems, dynamics and contacts problems. Materials can have any elastic or elasto-plastic constitutive law and yielding criteria. It is possible to schematize: truss, beam, pier and cable, considering no-linearity of the materials and 2nd order phenomenon (1 licence). • Sheet - pile walls: Finite elements elasto-plastic calculation software to verify multianchored sheet - pile walls, anchors, single or double sheet - pile walls, connected with truss or slabs. During successive phases, it is possible to change ground features. Options of creation/removal of constructive elements (anchors, truss, slabs, sheet pile walls). Line load, of area, filled. Extreme advanced constitutive model ground: able to understand the differences between phases of virgin load to phases of ultimate reload, and of cracking behaviour. Simulation of ground water flow effects, in to nohomogeneous material (2 licences). e) Accounting, metric calculation • PriMus Unico (ACCA software) f) Office automation • 15 Microsoft Office Professional licenses: text editor (WORD), table drafting (EXCEL), presentations (POWERPOINT), database management (ACCESS). • 1 CORELDRAW license: vectorial graphics software (CorelDRAW), image man agement (PHOTOPAINT), text or drawing acquisition from scanner (COREL TRACE), animation R.A.V.E. • 8 ADOBE ACROBAT licenses: creation and management of interchangeable documents among different platforms. • 1 Microsoft Project license: chrono-plan management The following documents are also part of the equipment used: • General documentation (made up of books, catalogues, publication extracts, examples of projects or technologies, didactic materials acquired during courses or congresses). • Journals and legislation. To ensure that quality measures are fulfilled, pursuant to Article 14 c. 1 let. and to Legislative Decree 157/95, all documentation is selected by professionals with adequate expertise and capability and it is recorded, filed, updated and distributed on databases and in appropriate archives by persons with specific responsibility. To ensure the quality of equipment and tools the following procedures are carried out: • Control and updates of purchases and of internal products by carrying out tests on software • Planning and execution of internal and external training on equipment and tools owned by the company • Safeguarding of data (back-up), software (anti-virus) and hardware (assistance). Constant control of reference documentation (legislation, regulations and technical documentation STUDIO CORONA 13 BROCHURE VIADOTTO MALPERTUGIO Autostrada Messina-Palermo SCHEMA STATICO: due travi continue indipendenti affiancate NUMERO CAMPATE: 7 LUCE MASSIMA: 100 m campate principali 61 m campate terminali LUNGHEZZA COMPLESSIVA: 672 + 672 m ALTEZZA DELL'IMPALCATO IN CHIAVE: 2,45 m ALTEZZA DELL'IMPALCATO ALLE IMPOSTE: 4,51 m GENERALITA' L'impalcato è sopportato da pile scatolari, a sezione variabile. La sezione corrente del viadotto è di tipo scatolare monocellulare ad anime verticali con altezza variabile, completata da sbalzi laterali di spessore variabile. Sono presenti telai di irrigidimento con funzione diaframmante solo in corrispondenza delle pile. SOLUZIONE STRUTTURALE La soluzione strutturale è quella di trave continua vincolata, in direzione longitudinale, solo in corrispondenza delle due spalle. Gli appoggi intermedi provvisori della trave continua sono stati sdoppiati permettendo, prima della solidarizzazione degli appoggi definitivi, una regolazione planoaltimetrica della struttura. MODALITA' COSTRUTTIVE Il viadotto è stato costruito col procedimento costruttivo a sbalzo dalle pile con l'impiego dei conci prefabbricati congiunti di lunghezza variabile da 3,05 m. a 2,50 m. Il montaggio è stato realizzato con l'ausilio di un carro varo. I conci sono stati precompressi temporaneamente con barre Dywidag, previa interposizione di resina epossidica tra le facce coniugate dei giunti. La precompressione definitiva è stata realizzata con cavi infilati tramite spingitrefolo dopo la precompressione temporanea. Le stampelle sono state collegate, dopo la regolazione planoaltimetrica, tramite il getto di un concio di chiave e le successiva messa in tensione dei cavi inferiori di precompressione. La disposizione dei cavi di precompressione superiore e l'ordine di montaggio sono stati studiati in modo da consentire la messa in opera con le barre temporanee anche di due conci a sbalzo, in modo da ottimizzare i tempi di costruzione. A regime la costruzione di una stampella completa ha richiesto 10 giorni lavorativi. 14 MALPERTUGIO VIADUCT Messina-Palermo motorway STATIC SCHEME: 2 indipendent continuous beams NUMBER OF SPANS: 7 LENGHT OF SPANS: centre spans 110 m approach spans 61 m OVERALL LENGHT OF THE VIADUCT: 672 + 672 m DEPHT OF THE DECK AT MIDSPAN: 2,45 m DEPTH OF THE DECK AT THE SPRINGERS: 4,51 m DESCRIPTION The deck is borne on box piers of variable sections. The viaduct typical section is a variable-depth single-cell vertical-wall box and side overhangs are of variable thickness. The crosspieces are stiffening frames placed only at the piers. STRUCTURAL SOLUTION The structural system is a continuous beam, constrained longitudinally only at the two abutments. The intermediate provisional continuous beam is constrained longitudinally only at the two abutments. The intermediate provisional continuous beam supports were split. In this way it was possible to adjust the structure in line and grade before the definitive bearings were solidly joined to it. CONSTRUCTION SYSTEM The viaduct was built by the cantilevered assembly both ways from the piers using match cast joint precast segments 3,05 m to 2,50 m long. A launching girder was used for the assembly. The segments were temporarily pre-stressed using Dywidag bears, after the wed faces had been spread with epax resin. Their final pre-stressing came from cables threaded through afterwards by strand pushers. The tees were tied, together, after adjustments in line and grade, by to pour of concrete at the crown and by tensioning the lower pre-stressing cables. The upper pre-stressing cables arrangement and the assembly sequence were worked out to permit placement of as many as two cantilever segments (held in place by the temporary bars) at to time, so as to optimize scheduling. In full operation, the construction of a complete tier took 10 working days. STUDIO CORONA 15 BROCHURE VIADOTTO CUPONEDDI S.S.V. n. 131 S.Simone - S. Teodoro (Sardegna) SCHEMA STATICO: in struttura mista acciaio-calcestruzzo NUMERO CAMPATE: 10 LUCE MASSIMA: 70 m campate principali; 40 m campate terminali ALTEZZA DELL'IMPALCATO: altezza costante di 2,60 m. GENERALITA' Il viadotto a 2 corsie separate, è realizzato in sistema misto acciaio-calcestruzzo con schema statico di trave continua a 10 luci: la corsia di discesa ha 8 campate intermedie di 70 m. di luce più due laterali, di luci 28 m. e 35 m.; le carreggiate di salita a 8 campate intermedie di 70 m. di luce e due laterali di 40 m. e 35 m. Gli sviluppi complessivi sono di m. 623 e 635. SOLUZIONE STRUTTURALE Sistema misto acciaio-calcestruzzo con schema statico di trave continua. Travate metalliche affiancate realizzate con schema a traliccio con controventi orizzontali e diaframmi verticali (cassone torsiorigido alla Bredt). La soletta è resa collaborante con la struttura metallica sottostante mediante connettori tipo Nelson elettrosaldati sulle briglie superiori dei tralicci. Le briglie sono costituite da elementi modulari di m. 6 di lunghezza prefabbricati a conci di lunghezza multipla e assembalti in opera mediante giunti bullonati AR ad attrito. I collegamenti delle aste di parete sono realizzati mediante bulloni 10.9 a taglio, così come i controventi orizzontali e i diaframmi. La soletta in cemento armato è gettata in opera utilizzando coppelle prefabbricate autoportanti in c.a. conteneti l’armatura inferiore trasversale definitiva. Dopo il varo delle coppelle si è provveduto alla posa in opera dell’armatura longitudinale di ripartizione e di quella trasversale superiore integrativa e quindi al getto a spessore definitivo. 16 CUPONEDDI VIADUCT S.S.V. n. 131 S.Simone - S. Teodoro (Sardegna) STATIC SCHEME: mixed construction in steel and reinforced concrete NUMBER OF SPANS: 26 MAXIMUM OPENING SIIZE: main spans 70m; end spans: 40m HEIGHT OF STRUCTURE: constant height of 2.60m DESCRIPTION The viaduct has two separate lanes; it is realised in a mixed system of steel/reinforced concrete with a static uninterrupted pattern of beams spanning 10m: the descending lane has 8 intermediate spans of 70m archway, plus two lateral ones of 28m and 35m; the ascent lane has 8 intermediate spans of 70m archway and two lateral ones of 40m and 35m. The overall lengths are 623m and 635m. STRUCTURAL SOLUTION It is a mixed system of steel/reinforced concrete with a static uninterrupted pattern of beams. The side by side metal beams are realised with a trestle-work pattern and horizontal bracing and vertical diaphragms (Bredt torsion-rigid boxes). The slab is made to work together with the underlying metal structure through the medium of Nelson-type connectors arc-welded on the upper bridle of the trestle-work. The bridles are constituted of modular elements 6m in length, prefabricated to conch forms of variable lengths assembled on site through the use of AR bolted friction joints. The connections of the wall bars are realised by means of 10.9 shear bolts, as with the horizontal bracing and diaphragms. The slab is made of reinforced concrete on site using prefabricated self-supporting pans in reinforced concrete, containing the definitive lower transversal mesh. After proceeding with the pans, the longitudinal mesh of separation and that of the upper complementary transversal are placed on site, followed by the pouring of concrete to the final thickness. STUDIO CORONA 17 BROCHURE CASERMA MANFREDINI - Cremona interventi di conservazione, recupero e adeguamento funzionale LE RAGIONI DEL PROGETTO All'inizio degli anni '80, la Caserma Manfredini presentava, specie nel nucleo antico dell'impianto monastico, dissesti statici di varia natura ed entità e mancava dei requisiti richiesti per l'accasermamento di reparti militari. L'insieme delle circostanze ha reso necessario uno studio preliminare sulle condizioni generali degli edifici e sulle loro potenzialità, al fine di verificare la loro attitudine, una volta risanati, a realizzare gli standards abitativi previsti per gli accasermamenti. ADEGUAMENTO FUNZIONALE L'intero progetto si sviluppa sulla base di tre ipotesi preliminari: rispetto assoluto delle valenze architettoniche e spaziali del complesso; valorizzazione e recupero tecnologicamente avanzato delle strutture portanti; ridistribuzione ottimale delle funzioni interne. Questo modo di procedere alla stesura del progetto costituisce la caratteristica peculiare di questo intervento. L'impostazione generale del lavoro ha portato a un programma di interventi per lotti successivi tale da assicurare, in modo continuativo, la funzionalità dei Reparti accasermati. ANALISI DEI DISSESTI E SOLUZIONI ADOTTATE Dai primi saggi, effettuati sulle principali murature portanti, si era accertato che le fondazioni non presentavano cedimenti o assestamenti vistosi tali da compromettere la stabilità degli edifici. La circostanza è insolita, in quanto gli edifici insistono su un terreno che per parecchi metri presenta caratteristiche geomeccaniche molto scadenti. Con buone probabilità, la causa deriva dal fatto che nel XV secolo, per edificare gli attuali edifici, furono rase al suolo le vecchie costruzioni, appoggiando le nuove fondazioni su quelle preesistenti. Ne conseguì che le nuove costruzioni subirono assestamenti molto modesti. Fanno eccezione il portico del chiostro maggiore e il muro prospiciente la via De Stauris, che nel corso del tempo hanno subito sensibili movimenti ed assestamenti tali da richiedere importanti opere di rinforzo. Il dissesto ha avuto origine anche dal dislivello di circa 1 metro esistente tra il piano di calpestio interno e la sede stradale, aggravato dalle vibrazioni dovute al traffico e alla presenza di un canale fognario adiacente al muro che ha compromesso le caratteristiche meccaniche del terreno. In prossimità del piano di campagna, a causa dell'umidità diffusa, tutte le murature del complesso, e in particolare quelle perimetrali, presentavano uno stato di degrado molto avanzato, con una sensibile diminuzione del margine di sicurezza delle murature stesse. Le strutture murarie superiori, inoltre a causa di numerosi interventi per la realizzazione di cunicoli, canalizzazioni e per la foratura dei muri al fine di inserire impianti, risultavano notevolmente indebolite in numerosi punti. 18 MANFREDINI BARRACKS - Cremona restoration, recovery and functional adaptation THE AIM OF THE PROJECT At the beginning of the 1980s the Manfredini Barracks presented varying degrees of static instability due to a variety of factors, especially in the ancient nucleus which had been a monastery. It did not fulfill the legal and practical requirements provided for by the law for the accomodations of military detachments. A preliminary study therefore had to be carried out on the buildings so as to assess their general condition and to evaluate whether restoration work would be able to satisfy the accomodation requirements and living standards suitable for military accomodation. FUNCTIONAL ADAPTATION The project is based on three preliminary hypoteses: absolute respect for the architectural and spatial values of the complex; the exploitation and advanced technological recovery of the load-bearing structures; the optimal redistribution of the functions of the rooms. This approach to the drawing up of the project is the particular characteristic of this operation. The work was planned in successive work allotments so that the military detachments could continue to use the barracks during the restoration. ANALYSIS OF THE INSTABILITY AND SOLUTIONS ADOPTED The first test, carried out on the main load-bearing walls, revealed that the subsdence or visible setlement of the foundations was not severe enough to compromise the stability of the buildings. This is unusual, as the buildings are standing on land with very poor geomechanical characteristics for several meters in depth. It is likely, therefore, that in the fifteenth century the previous constructions were razed to the ground and the foundations of the new buildings rested on the previous ones. As a result the settlement of the new buildings was very slight. Exceptions to this, there were the portico of the main cloister and the wall facing Via De Stauris, which in the course of time were subjected to such considerable movements and settlements as to require important reinforcement works. This settlements was also due to the difference of level of about 1 metre between the inside floor of the barracks and the roadway. The settlement was further aggravated by traffic vibrations and the presence of a sewer channel running adjacent to the wall which compromised the mechanical characteristics of the land. Near ground level all the walls of the complex, and in particular those of the perimeter, were in a very advanced state of deterioration due to the widespread damp and the safety margin of the walls themselves was severely reduced. Moreover, the upper wall structures were considerably weakened in several points because of numerous works undertaken in the past for the building of underground passages, canalizations and the drilling of holes for the insertion of wiring, plumbing and other systems. STUDIO CORONA 19 CASERMA MANFREDINI / MANFREDINI BARRACKS Per il risanamento del muro esterno lungo la via De Stauris si è proceduto: - al ripristino dei tiranti esistenti ed alla messa in opera di nuove catene sia sulla volta posta a copertura del piano terreno sia sul sottotetto, in corrispondenza dei muri trasversali, in modo da garantire una efficace legatura della scatola muraria; - alla creazione di un cordolo in calcestruzzo armato sulla sommità della muratura esistente, in modo da legare tutte le strutture nelle parti alte; - alla esecuzione di micropali di sottofondazione incrociati a cavalletto. Per il consolidamento del porticato del chiostro maggiore si è proceduto inizialmente alla cucitura del basamento delle colonne ed al successivo collegamento di questi ultimi con le parti restanti di muro, mediante barre di acciaio. Contro il fenomeno dell'umidità ascendente si è provveduto a tagliare orizzontalmente il muro, inserendo un foglio di materiale rigido con successiva sigillata a pressione SUPERFICI INTERNE Alla rimozione degli intonaci e dei materiali di rivestimento, i muri interni presentavano molti guasti, profonde tracce di vecchi passaggi verticali e orizzontali, fratture e altre discontinuità. In particolare l'ala Nord del chiostro grande, all'inizio dell'800, era stata oggetto di una consistente ristrutturazione. Le originarie volte a crociera furono demolite e sostituite con un'unica volta a botte a tutto sesto, in modo da realizzare un ambiente unico di m. 8x40, probabilmente destinato a scuderia. Al piano superiore furono demolite le volte che coprivano un corpo triplo e sostituite con travi in legno ed arelle, realizzando un vasto locale destinato a camerate. L'intregrità statica è stata ripristinata mediante la realizzazione di una soletta in calcestruzzo armato sull'estradosso, ancorata ai muri perimetrali; inoltre il materiale sciolto di rinfianco è stato sostituito con calcestruzzo leggero ed argilla espansa, mentre le lesioni sono state sigillate con malta reoplastica. 20 The following procedure was used for the restoration of the outside wall along Via De Stauris: - the existing braces were exploited and new chains were placed both on the vault covering the ground floor and on the attic in correspondence with the cross walls, so as to effectively bind the wall "box" - a girder was made in reinforced concrete along the top of the existing walls, so as to bind the upper parts of all the structures - crossed trestle underpinning micropiles were built. The bases of the main cloister portico columns were stapled and these were then connected to the remaining parts of the wall with steel bars to consolidate the structure. The cloister wall was cut horizontally and a sheet of rigid material was inserted and then pressure sealed for protection against the rising damp. INTERIOR SURFACES When the plaster and the other wall coverings were removed, the inside walls were seen to be very damaged. There were deep traces, of old vertical and horizontal passages, fractures and other discontinuances. In particular the north wing of the main cloister had undergone substantial restoration at the beginning of the 1800s. The original cross vaults had been demolished and substituted with a round barrel vault producing a single 8x40 m. room which was probably used as stables. On the upper floor the vaults covering the triple core of the building had been demolished and they had been replaced with wooden beams, producing a vast room for dormitories. The static integrity was restored by placing a reinforced concrete slab on the extrados, anchoring it to the perimeter walls. Light concrete and bloated clay replaced the loose material of the buttress, and the cracks were sealed with rheoplastic mortar. STUDIO CORONA 21 BROCHURE XX GIOCHI OLIMPICI INVERNALI TORINO 2006 - R14 "TREBIALS" Scheda illustrativa dell'impianto di risalita R14 "Trebials" - seggiovia quadriposto ad ammorsamento automatico DESCRIZIONE DELL'OPERA L'impianto di risalita R14 "Trebials", seggiovia quadriposto ad ammorsamento automatico, è ubicato nel Comune di Sestriere; la stazione di valle dell'impianto è situata nel piazzale di partenza degli impianti di risalita in Borgata Sestriere (1853 mslm), la stazione di monte è situata in adiacenza alla strada sterrata che costeggia il campo da golf di Sestriere (2124 mslm). Nel suo insieme l'opera è costituita da un magazzino, da una stazione di valle (motrice-tenditrice), da una stazione di monte (rinvio), con un dislivello tra gli ingressi delle stazioni di circa 265,50 m e dalla linea costituita da 2 sostegni di ritenuta, 2 sostegni a doppio effetto e 12 di appoggio per un totale di 16 sostegni distribuiti su una lunghezza sviluppata totale di circa 1507,48 m. La seggiovia è ad ammorsamento automatico con seggiole quadriposto con potenzialità di trasporto di 2400 P/h alla velocità di 4.50 m/s. Il magazzino per il ricovero di tutte le seggiole è posto a fianco della stazione di valle, inserito nello spazio esistente tra la stazione stessa e la vicina seggiovia "Poggi - Capret" e risulta interamente interrato con una sola parete libera, quella adiacente alla linea dell'impianto, e quindi correttamente inserito nell'ambiente alpino circostante. CARATTERISTICHE TECNICHE PRINCIPALI ubicazione della stazione motrice e tenditrice + magazzino ubicazione stazione di rinvio senso di marcia 22 a valle a monte antiorario lunghezza orizzontale fra gli ingressi di stazione dislivello fra gli ingressi di stazione lunghezza sviluppata della linea pendenza media fra le stazioni pendenza massima della fune m m m % % capienza di ciascun veicolo intervallo nella partenze potenzialità massima di trasporto velocità massima di esercizio equidistanza fra i veicoli in linea tempo di percorrenza fra gli ingressi stazione numero max veicoli in linea per ramo numero totale dei veicoli n° s P/h m/s m n° n° 4 6.0 2400 4.50 27.00 5' 35" 56 119 intervia numero numero numero numero numero m n° n° n° n° n° 5.20 16 12 2 2 242 in linea e nelle stazioni complessivo dei sostegni dei sostegni di appoggio dei sostegni a doppio effetto dei sostegni di ritenuta complessivo dei rulli, (134+108) 1477.50 265.50 1507.48 18.00 46.50 XX OLYMPIC WINTER GAMES TURIN 2006 - R14 "TREBIALS" R14 "Trebials"4-passengers detachable chairlift fact sheet INSTALLATION DESCRIPTION The 4-passengers detachable chairlift is located in Sestriere. Its bottom station is in the square at the start centre of all lifts in Borgata Sestriere (1853 m), while its uphill station is next to the road, which skirts Sestriere's golf field (2124 m). The installation consists of a garaging system, a drive tensioning bottom station and a return top station. The vertical rise between both stations entries is approx. 265.50 m and the line is equipped with 2 compression towers, 2 double action towers and 12 support towers, that means 16 towers along a line of 1507.48 m. The installation is of a detachable type with 4-passengers chairs for a capacity of 2400 P/h with a speed of 4.50 m/s. The garaging system for the chairs is located on the side of the bottom station, in the area between this station and the nearby chairlift "Poggi-Capret". It is underground, except for just one free wall next to the installation line, and therefore perfectly integrated with the alpine surrounding. OPERATING FEATURES OF THE INSTALLATION Location of the drive station Location of the return station Rotation bottom top anticlockwise Horizontal length Vertical rise Bent length Average slope of the track Maximun slope on the track m m m % % 1477.50 265.50 1507.48 18 46.5 Chair capacity Waiting time Max capacity Max speed Distance between chairs Travel time Number of chairs on a branch Total chairs n° s p/h m/s m n° n° 4 6 2400 4.5 27 5' 35" 56 119 Gauge Total towers Support towers Compression towers Double action towers Total number of sheaves m n° n° n° n° n° 5.2 16 12 2 2 242 STUDIO CORONA 23 BROCHURE GALLERIA SANTA CATERINA S.S.V. Licodia Eubea A19 Palermo Catania DESCRIZIONE DELL'OPERA La galleria Santa Caterina è inserita nei lavori di costruzione della Strada a Scorrimento Veloce Licodia Eubea - A19 Palermo Catania nel tronco compreso tra lo svincolo Regalsemi e l'innesto della Strada Statale n° 117 bis. La tipologia della galleria è a singola canna, a doppio senso di marcia con una piattaforma stradale di m 10,50 con due corsie di 3,75 m e banchine laterali da m 1,50 protette lateralmente da due profili ridirettivi in calcestruzzo. Le Formazioni geologiche interessanti il tracciato stradale sono riconducibili alla Formazione delle Argille grigio-azzurre sormontata da Formazioni sedimentarie con preponderanza di Sabbie gialle con sottili livelli calcarenitici. Nelle zone in sabbia i preconsolidamenti al contorno del cavo e sul fronte sono affidati alle colonne consolidate, tecnologia appropriata per lo scavo della galleria data la presenza di materiale granulare pronto a franare e la contemporanea vicinanza, in particolar modo nelle zone prospicienti gli imbocchi a bassa copertura, di manufatti ed edifici, e con la conseguente necessità di limitare al minimo i cedimenti superficiali. Le colonne estese al contorno del cavo, sul fronte di scavo e al piede delle centine sono eseguite mediante il sistema monofluido che consiste nella fratturazione del terreno mediante getti di miscela di cemento ad alta pressione con contemporanea miscelazione in posto. Per la stabilità del cavo è quindi prevista una coronella di colonne consolidate O 600 mm di diversa lunghezza eseguite dal fronte, un consolidamento del fronte con tratto di perforazione a vuoto di diversa lunghezza per eseguire le colonne in sicurezza lontano dal fronte, dove si provoca necessariamente la disgregazione del terreno con il getto di miscela di cemento ad alta pressione ed infine per migliorare la capacità portante al piede di appoggio delle centine è prevista l'esecuzione di colonne consolidate suborizzontali di diversa lunghezza ed iniettate a vuoto sino al piano di scavo. Nelle zone a maggior preponderanza argillosa i preconsolidamenti al contorno, nel fronte di scavo saranno invece utilizzate delle barre in vetroresina opportunamente iniettate a bassa ed alta pressione con miscele cementizie binarie. Il preconsolidamento è esteso anche al di sopra della calotta per poter assicurare una fascia di terreno di migliorate caratteristiche meccaniche ed elastiche per limitare l'estensione, durante la fase dello scavo, delle superfici di subsistenza. Entrambe le soluzioni di progetto hanno permesso di ottenere una deformazione controllata in superficie e limitare gli spostamenti e rotazioni sugli edifici esistenti per la decompressione del terreno innescata durante l'avanzamento della galleria. 24 SAINT CATHERINE'S TUNNEL S.S.V. Licodia Eubea A19 Palermo Catania DESCRIPTION The Santa Caterina tunnel is included in the construction works for the rapid traffic flow Licodia Eubea - A19 Palermo Catania roadway in the section included between the Regalsemi interchange the junction of the State Roadway No. 117 bis. The tunnel typology is of a single, two-way traffic tube with a roadway of 10.5m including two lanes of 3.75m and verges of 1.5m protected by guardrails in concrete. The geological makeup of the section of road is ascribable to the formation of blue - grey clay overlaid by sedimentary formations with a preponderance of yellow sands having thin layers of calcarenite. In the sandy areas, the pre-consolidations around the cavity and on the front, lies upon consolidated columns, this being appropriate technology for the excavation of the tunnel due to the presence of granular material ready to subside and the simultaneous proximity, especially in areas facing the entrances with little coverage, to simple structures and buildings, and the consequent need to minimise surface subsidence. The columns positioned around the cavity, on the front of the excavation and at the foot of the centring, are executed following the MONOfluido system that consists in soil fragmentation through jets of a cement mixture at high pressure with contemporaneous mixing on site. For the stability of the cavity, a crowning of consolidated columns, O 600mm of various lengths, is therefore planned, executed from the front, and a consolidation of the front with a section of holes of different depths for the execution of the columns in safety away from the front, where break-up of the earth is necessarily provoked through the high pressure jets of cement mixture, and finally, to improve the bearing capacity of the supporting foot of the centring, the execution of consolidated sub-horizontal columns of different lengths is planned, poured up to the level of the excavation. For the zones with a preponderance of clay, for the pre-consolidations of the surroundings in front of the excavation, instead, bars of fibreglass opportunely injected at low and high pressure with a binary cement mixture will be effected. Pre-consolidation is also extended over the vault in order to assure a strip of land with improved mechanical and elastic characteristics to limit extension, during the excavation phase, of surface subsidence. Both solutions for the project make it possible to obtain controlled deformation on the surface and limit shifting of and rotational effects on the existing buildings caused by decompression of the earth triggered during the advance of work on the tunnel. STUDIO CORONA 25 LOTTI AUTOSTRADALI MOTORWAY LOTS 26 DESCRIPTION CONTRACTOR YEAR Trafori motorway, Torino-Milano junction, lot 30 bis MATTIODA 1983 State road 36 " Como lake and Spluga", State road from Lecco to Trivio of Fuentes, lot 9 bis MATTIODA 1983 Palermo-Catania motorway, variant Fichera viaduct TECNOFIELD 1983 Genova, Serravalle motorway Brasile Tunnel restructuring work SPEA 1983 Punta Raisi-Mazara del Vallo Motorway, Rainwater disposal, lot 24 SAGECO 1983 Bridge on S.S. 32 POSCIO 1984 Motorway itinerary completion Roma-L’Aquila-Villa Vomano-Teramo I.B.C. 1984 Messina-Palermo motorway, Capo Calavà CONSORZIO AUT. ME-PA 1984 Motorway itinerary completion Roma-L'Aquila-Teramo, section: Cadarola-Villa Vomano, Bresciano-Villa Vomano junction DI GIUSEPPE 1985 Trafori motorway, section: S.S. 32 - Gravellona Toce, section: Gattico Carpugnino, lot 2 LAURO 1986 Trafori motorway MATTIODA 1986 Patti-Rocca di Caprileone Area C section, inverted arch in "Petraro" tunnel between 2+058,77 and 2+118,77 CONSORZIO AUT. ME-PA 1987 Road connection between Frejus tunnel and Torino, lot 1°, Borgone junction - S.S. 25 connection to S.S. 24 ROZZI 1987 III° section: Deveys-Susa (Autoporto) section: Ramat Est-Susa (Autoporto) Passeggeri viaduct, lot 5 and Venaus viaduct, lot 4 LUNGARINI 1987 III° section: Deveys-Susa (Autoporto) section: Ramat Est-Susa (Autoporto) Brunetta viaduct - lot 6 CAF 1987 Motorway Mestre-Vittorio Veneto-Pian di Vedoia - section: Vittorio Veneto-Pian di Vedoia - lot 5 IMI TUNNEL 1987 Connection between Bardonecchia and Rivoli - Mompantero tunnel- lot 8 MATTIODA 1988 Connection between Bardonecchia and Rivoli section: III Deveys-Susa (Autoporto) section: Ramat Est-Susa (Autoporto) Dora-Autoporto, lot 9 F.A.R. 1988 Road connection between the Frejus Tunnel and Torino (Ring road Nord) section: Deveys-Susa - lot 16 COGEI 1988 STUDIO CORONA 27 LOTTI AUTOSTRADALI / MOTORWAY LOTS 28 DESCRIPTION CONTRACTOR YEAR Connection between Bardonecchia and Rivoli, section VI Avigliana-Rivoli from Km. 23+426,26 to Km. 27+097,19 - lot 28 I.B.C. 1988 Messina-Palermo Motorway - lot 23 bis ICLA 1988 Monte Bianco-Aosta Motorway - lots 6-7 S.C.A.V. 1988 Messina-Palermo Motorway viaduct Malpertugio I.R.A. 1988 Messina-Palermo Motorway viaduct Inganno COGEI 1988 Messina-Palermo Motorway - lot 23 FEDERICI 1988 Aosta Ring road FOLLIOLEY 1988 Torino-Savona Motorway – additional lane works (II carriageway), section: Priero Altare section: Priero-Rivere - lot 12 DI CORATO 1989 Aosta ring road system section: Aosta Est-Border (Suaz bridge) BERTINO 1989 Connection between Bardonecchia and Rivoli - Susa (Autoporto)-Rivoli section VI: Avigliana-Rivoli lot 29 COGEFA 1989 Connection between Bardonecchia and Rivoli - Susa (Autoporto)-Rivoli section VI: Avigliana-Rivoli lot 31 ITINERA 1989 Motorway Livorno-Civitavecchia First section Livorno-Cecina, lot 4 I.B.C. 1989 Aosta-Monte Bianco Motorway Section: Sarre-Morgex, lot 10 DELLA MORTE 1989 Aosta-Monte Bianco Motorway Section: Morgex-Sarre FOLLIOLEY 1989 Trafori Motorway Section: S.S. 32-Gravellona Toce Section: Carpugnino-Feriolo lot 11 ITINERA 1989 STUDIO CORONA 29 LOTTI AUTOSTRADALI / MOTORWAY LOTS 30 Trafori Motorway - section: S.S. 32Gravellona Toce - section: Gattico-Carpugnino ITINERA 1989 Connection between Bardonecchia and Rivoli - Susa (Autoporto) - Rivoli section VI: Avigliana-Rivoli lot 27 CAF 1990 Connection between Bardonecchia and Rivoli - Susa (Autoporto) - Rivoli section VI: Avigliana-Rivoli lot 30 INC 1990 Connection between Bardonecchia and Rivoli - Susa (Autoporto) - Rivoli - 5° section section between Condove and S.Ambrogio-Torre del Colle - 1° extract RECCHI 1990 Motorway A7 Milano-Serravalle enlargment to 3 lane-road of motorway platform connection A21-A26 CODELFA 1991 Alcamo Junction at Fagotto at Km 51+240 of A29 Palermo-Mazara del Vallo CO.MA.PRE. 1991 Connection between Bardonecchia and Rivoli - Susa (Autoporto) - Rivoli fifth section Section between Condove and S.Ambrogio-Torre del Colle - II° extract CIS 1991 Connection between Bardonecchia and Rivoli - Susa (Autoporto)-Rivoli- section IV: Susa (Autoporto)-Bussoleno- lot 22 ROTUNNO 1992 Torino ring road system Drosso-Orbassano branch II° section B&V 1992 Torino-Bardonecchia Motorway - section IV: Susa (Autoporto)-Bussoleno - lot 21 ITINERA - B&V IRCES 1992 Valle d'Aosta branch, Monte Bianco-Aosta motorway, section: tunnel Monte Bianco-Morgex, lot 5 DI PENTA 1992 Connection between Bardonecchia and Rivoli-Susa (Autoporto)-Rivoli, section IV: Susa (Autoporto)-Bussoleno, section between Km. 0+000 and Km. 5+508,19 for change in course LOMBARDINI 1992 Connection between Bardonecchia and Rivoli section IV: Susa (Autoporto) -Bussoleno section between Km. 0+000 and Km. 5+508,19 for change in course lot 20 INC 1993 Connection between Bardonecchia and Rivoli - Susa (Autoporto) - Rivoli, section VI: Susa (Autoporto)-Bussoleno, section between Km. 0+000 and Km. 5+508,19 for change in course LOMBARDINI 1993 Trafori Motorway – Working drawings Section S.S.32 - Gravellona Toce Section Gattico - Carpugnino from Km.0+00 to Km.18+550 - Viaduct Colorio (Work included in lot n°5) – ramification COOPCOSTRUTTORI 1993 Torino-Ivrea-Quincinetto - Ivrea-Santhià Turin ring road system works Torino – Ivrea Motorway ATIVA S.P.A. 1993 Messina-Palermo Motorway, extension Patti-Buonfornello, 2° section: S.Stefano di Camastra-S.Agata di Militello section: S.Agata di Militello-Caronia-"Pizzo Turda", lot 24 bis ITINERA 1994 Messina-Palermo Motorway, Patti-Buonfornello extension, 2nd section: S.Agata di MilitelloCaronia-"Piano Bandiera", lot 23 ter GITTO 1995 Messina-Palermo Motorway, PattiBuonfornello extension, 2nd section: S.Agata di Militello-S.Stefano di Camastra"Periano, lot 24 FONDEDILE ICLA 1995 Torino-Ivrea-Quincinetto - Ivrea-Santhià Torino Ring road motorway works - Orbassano-Pineralo Motorway junctions - 2nd branch ATIVA S.P.A. 1994 Torino-Ivrea-Quincinetto - Ivrea-Santhià Torino ring road motorway system Ivrea – Santhià Motorway ATIVA S.P.A. 1994 Messina-Palermo Motorway Patti-Buonfernello extension - 2nd branch: S. Stefano di Camastra - S.Agata di Militello Section: S.Agata di Militello - Caronia Lot 24 bis "Pizzo Turda" ITINERA 1994 Torino-Ivrea-Quincinetto - Ivrea-Santhià Torino ring road motorway system Torino-Quincinetto - Ivrea-Santhià Rio Ribes City of Pavone Canavese ATIVA S.P.A. 1995 Messina-Palermo Motorway - PattiBuonfernello Extension - 2nd branch: S.Agata di Militello-S. Stefano di Camastra Section: S.Agata of Militello - Caronia Lot 23 ter "Piano Bandiera" - II Extract C.E.C 1995 Autostrada dei Fiori S.p.A. - Sanremo variant to S.S. n°1 "Aurelia" Section: Arma di Taggia - Ospedaletti Working project VIALIT 1995 Torino-Savona Motorway – Working project for additional lane – branch CarmagnolaPiero Lot 8 and 8 bis – from Km.73+122 to Km.82+690 HERA S.P.A. 1995 Interference with Rio Acque Rosse in the Lessolo and Salerano area and crossing items ATIVA S.P.A. 1995 Pedestrail walkway on the variant on s.s.n°20 in the "Sabbioni" area ATIVA S.P.A. 1995 Messina-Palermo Motorway - Caronia 1 tunnel - Lot 25 - 1° Extract GITTO 1996 Messina-Palermo Motorway - Extension Patti-Buonfornello - Working project 2° branch: S.Stefano of Camastra-S.Agata of Militello - Section: Caronia-S. Stefano of Camastra Lot 25bis "Pagliarotto" P&P S.C.A.R.L. (C.E.C.) 1997 Messina-Palermo Motorway - Extension Patti-Buonfornello - Working project 2nd Branch: S.Stefano di Camastra-S. Agata di Militello - Section: CaroniaS.Stefano di Camastra - Lot 26 "Portale" P&P S.C.A.R.L. (C.E.C.) 1997 Torino-Ivrea-Quincinetto - Ivrea-Santhià Torino ring road motorway system Motorway branch Orbassano-Pinerolo functional branch completion for Colombiadi coll NP1365 ATIVA S.P.A. 1997 Messina-Palermo Motorway - 2° branch S.Stefano di Camastra-S.Agata di Militello Section Caronia-S.Stefano di Camastra Lot 26bis "Canneto" TE.DI.G. S.C.A.R.L. 1997 Messina-Palermo Motorway - 2° branch S.Stefano di Camastra-S.Agata di Militello Section Caronia-S.Stefano di Camastra Lot 27 "S.Stefano" 1° Extract TECNOFIN 1997 Interference with Orco river and relative riverside plans ATIVA S.P.A. 1998 Messina-Palermo Motorway Extension Patti-Buonfornello 1° Branch Buonfornello - S. Stefano di Camastra - Section: S. Stefano di Camastra - Tusa - Lot: 27 ter "Torremuzza" 1998 TORREMUZZA S.C.A.R.L. (C.E.C.) Salerno-Reggio Calabria Motorway Branch 2° - Section 4° - Lot 2° from Km. n213 +500 to Km. 222+000 (Altomonte exit - Serra dell'Ospedale tunnel) - Work to comply with 1° category of the C.N.R. norms - Working project COOPCOSTRUTTORI 1999 STUDIO CORONA 31 LOTTI AUTOSTRADALI / MOTORWAY LOTS 32 Messina-Palermo Motorway - Extension Patti-Buonfornello - 1° branch: BuonfornelloS. Stefano di Camastra - Section: TusaCastelbuono Lot 30 - 1° Extract "POLLINA" POLLINA S.C.A.R.L. (C.E.C.) 1999 Messina-Palermo Motorway - Extension Patti-Buonfornello - 1° branch: BuonfornelloS. Stefano di Camastra - Section: TusaCastelbuono - Lot 30 bis "TORRE FINALE" POLLINA S.C.A.R.L. (C.E.C.) 1999 Salerno-Reggio Calabria Motorway Modernisation and adaptation works branch 1 - Section 6 - Lot 3 (DG 68/97) from Km 88+657 to Km. 103+840 C.I.R. (COOPCOSTRUTTORI) 2000 Siracusa-Gela Motorway 1° branch: Siracusa-Rosolini Lot: 4 "Noto" - Cozzo Inferno Tunnel BALDASSINI TOGNOZZI 2000 Siracusa-Gela Motorway - 1° branch: Siracusa-Rosolini - Lot: 5 "Rosolini" BALDASSINI TOGNOZZI 2000 Messina-Palermo Motorway Extension Patti-Buonfornello Lot 29 quater "Piano Paradiso" PIANO PARADISO S.C.A R.L. (C.E.C.) Messina-Palermo Motorway - Extension Patti-Buonfornello - Working project 1° Branch: Buonfornello - S. Stefano of Camastra - Section: Tusa-Castelbuono - Lot 30ter " Cozzo Minneria Tunnel " - 1° Extract POLLINA S.C.A.R.L. (C.E.C.) 2000 Salerno-Reggio Calabria Motorway Branch 3° - Lot 4° from Km. 383+000 to Km. 393+500 BALDASSINI TOGNOZZI 2003 Ring road Nord of Torino – widening of 4th lane - Preliminary project ATIVA S.P.A. 2003 Construction design for adaptation of the Bruere interchange of the Torino Motorway ring road system CO.GE.FA. 2004 Motorway (A1): Milano-Napoli Apennine Crossing section adaptation between Sasso Marconi and Barberino of Mugello - Lots 9-10-11 - VS010/VS018 Minor works of art EDILFOR S.p.A. 2006 DG 48/04 - Macrolot n. 2: Motorway SA - RE – Modernisation and adaptation work to type 1/to of norms CNR/80 - branch 1°, section 7°, Lot 1°, Lot 2°, Lot 3°, Lot 4°, Lot 5°, from Km. 107+000 to Km. 139+000 SIS S.p.A. 2007 Completion project of the motorway collector and of Annunziata Junction COMUNE DI MESSINA 2007 2000 ASR 47/04 - Salerno - Reggio Calabria Motorway - Stretch 2° - Section 4° - Lot 3° from Km. 221+443 to Km. 225+800 – Modernisation works to comply with Category 1A of the C.N.R./80 norms CARENA S.p.A. 2008 (A1) Milano-Napoli Motorway Works on Apennine crossing section between Sasso Marconi and Barberino di Mugello - Lots 6 and 7 - Itinerary VS6 Requalification existing S.C. EDILFOR S.p.A. 2008 Asti-Cuneo Motorway connectionSection: A6 (Massimini)-Cuneo – Lot 4-3: Cuneo-Castelletto Stura-Consovero MARIETTA S.r.l. 2009 Asti-Cuneo Motorway connection Traffic barriers – Provincial road variants - Hydraulic testing ITINERA S.p.A. 2009 A51 – Milano East ring roadRestructuring of Lambrate Exit and viability access to the City of Segrate Segrate Lambrate S.c.a.r.l. 2009 Salerno-Reggio Calabria Motorway Modernisation works to comply with Category 1A of the C.N.R./80 - Stretch 1° - Section 6° - Lot 3° (DG 68/97) from Km. 88+657 ALEANDRI S.p.A. 2009 Pedemontana Piemontese – Creation of the A4 – A26 - Biella Motorway system Plano-altimetric project ATIVA S.p.A 2010 Asti-Cuneo motorway connection Section 1 Massimini (A6) - Cuneo - Lot 5 Cuneo S.S. 231 from km. 0+000 to km. 2+382 – Phase 2 – main works Ronchi artificial tunnel ITINERA S.p.A. 2010 Orastie-Sibiu motorway working drawings Lot 2 SETRACO S.p.A. 2011 STUDIO CORONA 33 LOTTI STRADALI ROAD LOTS 34 DESCRIPTION CONTRACTOR YEAR St.Vincent variant to progr. 76+000 in the City of Chatillon FOLLIOLEY 1984 Work between Km. 41+600 and Km. 46+000 in the Barricate area - Lot 2 VIALIT 1984 Work on Varese Ring road ITALVIE 1984 Dorsale Appenninica-Isernia ICORI 1985 Raccordo Anulare between Via della Magliana and S.S. I "Aurelia" junction NATALUCCI 1985 Superstrada Gravellona Toce-Sempione, lot 2 ITINERA 1985 Superstrada Gravellona Toce-Sempione, lot 5 LAURO 1985 S.S. 445 (of Garfagnana) SALGET 1985 Superstrada Gravellona Toce-Sempione, lot 1 POSCIO 1985 Superstrada Gravellona Toce-Sempione, lot 3 SARDAVIE 1985 Rationalization of Ittiri-Usini-Tissi connection with S.S. 131 EDISTRA 1985 S.S. 340 "Regina", Variant in the tunnel in Brienno built-up area CIR 1985 Slip road between S.S. 76-Motorway A14 Ancona Falconara airport and Falconara Ovest-S.S. 16 junction MAGGIONI 1985 S.V. Caltanissetta-Gela, lot 5 CIR 1985 S.S. 26, section: Pont St. Martin-Verres FOLLIOLEY 1985 Carrara, Strada del Marmo EDILTIRRENA 1985 S.V. "Bradanica" Road, province of Potenza GI.CO 1986 S.S. 77 "Val di Chienti", section: MucciaCaccamo, MAGGIONI (Ascoli Piceno) - lot 2 MAGGIONI 1986 S.S. 107 "Silana Crotonese" branch: Paola-Cosenza, Tunnel Crocetta DELPRATO 1986 S.S. 1 "Aurelia", section from Follonica Nord and S.Vincenzo Nord, lot 10 EDILSTRADE 1987 S.S. 16 "Adriatica", branch: Ponte Molino-Ponte Saccione, Variant out of Termoli’s built-up area LUNGARINI 1987 Completion 1° lot of the "Strada delle Terme" and construction of variant to S.S. 18 out of the built-up area of Guardia Piemontese Marina EDISTRA 1987 S.S. 583 "Lariana", branch: Como-Bellagio second Extract SI.GE.CO. 1987 Catania-Ragusa itinerary completion, 1° Extract from Km. 11+150 to Km. 13+493 - S.S. 194 PORTO TORRE 1987 S.S. 36 Ring road of Lecco, I° Extract from Via Fiandra to Corso Matteotti, lot 2 FERROCEMENTO 1987 S.S. 36 Ring road of Lecco(ring-road), II° Extract from Corso Matteotti to Vallone S.Martino, lot 2 PONTELLO 1987 Catania-Ragusa itinerary completion, II° Extract section between S.S. 194 and S.S. 224 ICORI 1987 S.S. 340 DIR "Regina", branch: MenaggioS.S. 36 entry ELSE 1987 Junction of Bruere, widening of lane MilanoPiacenza ATIVA 1987 Completion I° and II° branch of "Strada delle Terme" and construction of variant to S.S. 18 out of the built-up area of Guardia Piemontese Marina EDISTRA 1987 STUDIO CORONA 35 LOTTI STRADALI / ROAD LOTS 36 Overall work on the section between Km.63+750 and 83+900, Completion 5° lot CROSETTO 1987 III° lot bis of Ostigliano junction to the FS Station of Vallo della Lucania DAMONTE 1987 Work on S.S. "Mar Piccolo"- Taranto SACIC 1987 S.S. 347 of Passo Cereda and Passo Duran, adaptation and modernization work in some sections between la "Valle" and "Passo Duran" TECNOSVILUPPO 1988 S.S. 226 of Valle Scrivia, branch: Laccio-Busalla EDILFORESTE 1988 S.S. 27 of Gran S.Bernardo, branch: Aosta-Swiss border-Gignod EDILPRO 1988 S.S. 163 "Amalfitana" EDISTRA 1988 S.V. road of Val di Sangro, Colledimezzo junction construction COOPCOSTRUTTORI 1988 S.S. 387 "dei Gerrei", work on section between Km. 63+750 and 83+900, lot 5 ROMANA SCAVI 1988 Chiaravalle work completion MAGGIONI 1988 Engineering of the urban area servicing the Industrial and Port areas of the tourist area of Porto Empedocle ICORI 1989 S.S. 481 " Valle del Ferro", variant for the connection of Jonio to Lucania Merid. Chiaravalle work completion COOPCOSTRUTTORI 1989 Variant to S.S. I "Aurelia" in the built-up areas of Finale Ligure and Albenga PROVINCIA di Savona 1989 S.S. 180 "dei due mari", Completion connection between motorway access and S.S. 280/racc., lot I SACIS 1989 S.S. 388 "Mongrando", branch: Biella Access to S.S. 228 IBC 1989 S.S. 299 of Alagna, branch: S.S. 142 access LAURO 1989 S.P. "Biella-Valsesia", branch: CrocemossoPray biellese LAURO 1989 FI-PI-LI High way road, section: FirenzePontedera COSNA 1989 S.S. 80 "Gran Sasso d'Italia", branch: Ortolano-Teramo DI CORATO 1989 S.S. 131 "Carlo Felice" High way road, branch: S.Simone-S.Teodoro II° Extract, lot I bis PONTELLO 1989 S.S. 336 Malpensa Airport LUNGARINI 1989 S.S. 2 "Cassia", branch: bridge ElvellaSiena-Tunnel "le Chiavi" BOGLIOLO 1989 S.S. 336 Malpensa Airport INES 1989 S.S. 89 "Garganica", High way road from toll gate of Poggio Imperiale A14 to Vieste, branch: Rodi Garganico-Vico del Gargano,lot I LALLI 1989 Creation of II° Extract, section of S.S. 566 ITINERA 1989 S.S. 27 Gran S.Bernardo, branch: AostaCity of Stato ROSSI 1989 S.S. 16, S.S. 16 "Adriatica" road junction and S.P. Standina PROVINCIA di Ravenna 1989 S.S. 28 Ring road of Mondovì with connection to 28 DIR.-564 and to A6 toll gate, lot I SACIC 1990 Nuoro-Lanusei high way road, branch: Piraonni-Villanova, lot I ASTALDI 1990 S.S. 86 "Istoria", branch: Belmonte of Sannio-Castiglione M. Marino SENTE 1990 S.S. 117 "Centrale Sicula", itin. Nord-Sud, lot 4 ITALSTRADECOSIAC 1990 S.S. 30 "Valle Bormida", branch: Acqui Terme-Compartimental border RECCHI 1990 S.S. 232, branch: Cascina DonnaBocchetto Sessera FABIANI 1990 Junction of S.S. 189 in Bivio Borgo Pasquale (Tumarrano) as service of S.P. 26, 1° Extract ITALCOSTRUZIONI 1990 S.S. 77 "Val di Chienti", section: Muccia-Caccamo MAGGIONI 1990 S.S. 583 "Lariana", branch: Bellagio-Lecco I.B.C. 1990 S.S. 28 "Colle del Nava", branch: of Nava Imperia, modernization DAMONTE 1990 S.G.C. Sassari, Truncu Reale-Porto Torres, S.S. 131 variant CROSETTO 1990 Road to S.V. Caltanissetta-Gela, preliminary project of section between "Maddamesi" and "Carruba", lot 6 RIZZANI DE ECCHER 1990 Road to S.V. Nuoro- Lanusei, branch: Piraonni-Villanova, lot 2 FERRARI 1990 S.S. 20 "Colle di Tenda", Variant on hairpin curve to Km. 104+700 MORINO 1990 S.G.C. Sassari, Truncu Reale-Porto Torres, variant S.S. 131 ROSSI 1990 S.S. 16 "Adriatica", branch: Ponte MolinoPonte Saccione, construction of a second carriageway in the section included from S.P. Termoli-Guglionesi to S.S. 87 "Sannitica" LUNGARINI 1990 S.S. 229-323-41-11-211, branches: various, connection to built-up area of Novara, lot 3 MARCOLI 1990 STUDIO CORONA 37 LOTTI STRADALI / ROAD LOTS 38 S.S. 45 bis "Gardesana Occidentale", variant Treponti-Tormini IMPRESEM 1990 S.S. 10 "Padana Inferiore"- S.S. 35 "dei Giovi"-S.S. 461 "del Penice"- Voghera Ring road, lot 1 ITINERA 1990 Work on S.S. 1 "Aurelia", section: Follonica-Cecina, lot VI B FEDERICI 1990 S.S. 118 "Corleonese Agrigentina", work on section between Corleone and Agrigento RAMBELLI 1990 Connecting road of Salerno-R. Calabria motorway to S.S. 585 and with built-up area of Lauria, section: S.S. 585-Lauria CHIEMENTIN 1990 S.S. 659 " Valle Antigonio and Valle Formazza", branch: from Km. 0+000 to State border LAURO 1990 S.S. 481 " Valle Ferro" EDILCONSOL 1990 S.S. 494 "Vigevanese", branch: Confine Pavese-Alessandria, Valenza ring road completion PORTALUPI 1990 S.S. 10 "Padana Inferiore"- S.S. 35 "dei Giovi"- S.S. 461 " Pendice"- Casteggio and Voghera ring roads, lot 3 ITINERA ANDANTI 1990 S.S. 456 "of Turchino", branch: Asti-Acqui, construction of variant out of the built-up area of Nizza Monferrato, lot 2A SOLAZZI 1991 Strada to S.V. Nuoro-Lanusei, branch: Piraonni-Villanova, lot 4 GITTO 1991 S.S. 280 "dei due mari", Completion of connection between the motorway access and the S.S. 280 junction area of Germaneto, lot 2 SACIC 1991 S.S. 455 "of Pontestura", branch: Vercelli-Pontestura, construction of variant in built-up area of Desana VERARDI 1991 Road to S.V. "Bradanica", 7 branch from Piani di Scaccia to junction Leonessa GI.CO. 1991 S.S. 415 "Paullese", branch: Castellone- Cremona CO.MA.PRE 1991 Gardesana Occidentale, variant from Treponti to Tormini, lot 3 EDILSTRADE 1991 Road to S.V. Caltanissetta-Gela, junction exits for Caltanissetta and Pietraperzia ASTALDI 1991 Road to S.V. Caltanissetta-Gela, construction of section between "Carruba" and junction for Licata, 2° Extract lot 6 SARDAVIE 1991 S.S. 64 "Porrettana", modernisation work of section between Marano and Carbona, 1° Extract "Riola Ring road" ASTALDI 1991 S.S. 33 "Sempione", branch: GravellonaToce-Iselle LAURO 1991 S.S. 113 "Settentrionale Sicula", branch: from Km. 106+500 to Km. 150+000, construction of variant in Furiano I.C.R. 1991 S.S. 280 "dei due mari" SACIC 1991 S.S. 659 "Valle Antigorio and Formazza" ITINERA 1991 E45 Orte-Ravenna high way road, lot 5 C.M.C. 1991 S.S. 11 "Padana Superiore", variant to the built up areas from Urago d'Oglio (S.S. 469) to Brescia (Ring road), lot 3 SI.GE.CO. 1991 S.S. 170 "Diramazione", branch: Andria-Barletta LALLI 1991 S.S. 43 "Val di Non", ringroad of the builtup area of Taio, section: Mollaro-Taio EDILGEMA 1991 S.S. 340 "Regina", work from Cima di Porlezza to State Border CARRIERO E BALDI 1991 S.S. 236 "Goitese", modernisation in sections Montechiari-Modena COOPCOSTRUTTORI 1991 National viability slip road to the new Provincial Road from Lecco to Ballabio, lot 0 CARIBONI 1991 Variant out of the built up area of Gavi between S.P. 161 "Crenna" and S.V. 160 of Val Lemme ITINERA 1992 S.S. 256 "Muccese", Camerino variant MAGGIONI 1992 S.S. 42 External variant to the built up areas of Capo di Ponte-Sellero-Codegolo, lots 5 and 6 COSIAC 1992 S.S. 231 "Santa Vittoria", branch: Fossano-Cuneo Fossano Ring road, lot 1 Ing. FRANCO 1992 S.S. 16 "Adriatica", Variant out of the Savio built-up area SACIC 1992 S.S. 142 "Biellese"- S.S. 229 "of Lago d'Orta", construction of variant in the built up areas of Cureggio-Borgomanero, lot 2 I.N.C. 1992 S.S. n.232 "Panoramica Zegna" - Branch: cascina Donna-Bocchetto Sessera – Section Cossato-Valle Mosso - Construction work project of access variant S.S. 142 "Biellese in comune of Cossato alla località Volpe - conn NP1437 CONSORZIO COMUNI BIELLESI 1993 Province of Cuneo – Variant west of Bra from S.S. 661 to S.S. 662 with connection to S.S. 231 I.N.C. 1994 S.S. n.38 "dello Stelvio" - Branch: TiranoBormio – Urgent work for the reconstruction of the variant of section "GrosioSondalo- Bormio" (prov. of Sondrio) (progr. Km. 80+000 - 100+000) - I lot LAURO 1994 Province of Novara - S.S. n.142 "Biellese" and S.S. n.229 "of lago d'Orta" - work for the reconstruction of the variant to the built up areas of Curreggio and Borgomanero II lot - ex 1442 I.N.C. 1994 Concession work for the construction of a new connection road between Via E.Brizio and the West Ring road - 2° Extract Ex 1443 I.N.C. 1994 S.S. n°340 "Regina" - Branch: Menaggio – State border - Work from Cima di Porlezza Km. 46+200 to State border CARRIERI & BALDI 1994 S.S. n°469 – Urgent work project necessary for the restoration of interrupted traffic due to removal of road section between Km. 14+500 and 14+600 ITINERA 1994 S.S. n°23 "of Colle del Sestriere" requalification of variants from Km. 31+834 (Riva of Pinerolo) to km. 56+500 (Perosa Argentina) ATIVA S.P.A. 1994 S.S. n°142 "Biellese" – reconstruction work on 3 viaduct spans on the river Cervo CIMOLAI 1994 S.S. n°590 "of Val Cerrina" - Branch: Torino-Casale Monferrato – Urgent work on the variant to the S.S. n°590 - conn NPA199 LICIS 1995 S.S. n°458 "of Casal Borgone" – Urgent work project for the reconstruction of the bridge on the river Po in the area of Chivasso to Km.0+700 - ex SNP12 conn 1455 UNIARCAS/UNIECO 1995 S.S. n°106 "Jonica" - Branch: Reggio Calabria-Monasterace M. Modernisation work of section between i Km. 42+000 and 48+000 - Completion work on the access to S.S: n°106 CUTRUPI 1995 City of Campobasso – Connection road to new hospital TRE ELLE (PALLANTE) 1995 STUDIO CORONA 39 LOTTI STRADALI / ROAD LOTS 40 S.S. n°12 dell'Abetone and Brennero Construction work on variant to Isola di Scala - II Extract of progr. 3770 of progr. 6107 - Working project SACIC 1995 Bridge on Po collapsed in Chivasso. Work for alternative and provisional connection between Verolengo and S.Sebastiano Po through partial use of S.P. n°94 "S.Sebastiano" COGEFA 1995 S.S. n°76 "Val d'Esino" - construction work for variant to the city of Fabriano between progr. Km.12,050 and Km. 26,380 OF Km. 12.845 - 3° lot Working project ITINERA 1995 S.S. n°105 "Of Castrovillari" – Construction of Variant out of the built-up area of S.Agata d'Esaro between Km. 22+685 and Km. 23+765 Landslide recovery work GRIMOLI 1995 S.S. n°113 "Settentrionale Sicula" – Urgent work for the Completion of s.u. bridge consolidation on the river "Mela" to Km. 41+060 with structural recovery of the masonry-work and carriageway adaptation VI.CO. Immob. e VIRGA 1995 S.S. N°16 "Adriatica" - Branch: Ponte Molino-Ponte Saccione – Urgent work for the restructuring of piers n°6 and 7 of the Petrara viaduct to Km. 542+300, seriously damaged LUNGARINI 1995 Via Boschetto underpass to Cremona SI.GE.CO. 1995 S.S. n°28 of “Colle di Nava" - Branch: Gressio-Compartimental boundary DAMONTE 1995 Completion work on the Modena ring road system – Junction with S.S. n°255 to Km. 2+383 Working project SACIC 1995 S.S. n°4 "Salara" - Branch: Rieti-Tufo Urgent work for the plano-altimetric correction of S.S. n°4 "Salaria" between progr. 127+000 and 127+400 ROMANA SCAVI 1995 City of Cosenza - Sector LL.PP. – Public procurements tender for the engineering and construction of a bridge over the river Cratiche MERLO 1995 S.S. n°339 "of Cengio" - Branch: Cortemilia- Compartimental border Province of Cuneo - Urgent work on the road between Km. 14+000 and Km. 14+850 LAURO 1995 S.S. n°1 Aurelia – Work on the section Follonica – Cecina Completion - Lot VIB COLASANTE 1995 S.S. n°388 "Mongrando" - Branch: BiellaAccess S.S:n°228 – Working project for construction of variant between Biella and Mongrando COOPCOSTRUTTORI 1996 S.S. n°647 - centre n°2 - Nucleus 5° Urgent work project for the reconstruction of the span and static recovery of the elements of the viaduct "grotta del Mulino" TRE ELLE 1996 Access to 1997 Ski Championships Val di Susa - viability Oulx - Cesana (S.S. n°24 ) - 1° Extract – Section between Oulx (Moretta) and Cesana Torinese - Conn NP1506 SACIC 1996 S.S. n°9 "Via Emilia" - Variant out of the built-up area of Anzola between Km. 122+250 and Km.126+430 SACIC 1996 Reconstruction work on bridge over the river Ellero along the road connecting Noreo and Baracco INTERSTRADE 1996 S.S. n°29 "of Colle of Cadibona" Project for construction work of the variant out of the built-up area of Montà at Km. 40+100 to Km. 45+400 IBC 1996 S.S. n°339 "Of Cengio" - Branch: Cortemilia-Compartment border Urgent work for the reconstruction and work on the road between Km. 1+800 and 3 +000 CAVEBI 1996 S.S. n°24 "of Monginevro" Branch: Oulx- Stato borderConstruction on the Variant to S.S.n°24 of Monginevro in the area of Cesana. 1° Extract functional working project RUSCALLA 1996 S.S. n°460 "of Ceresole R." - Branch: Cuorgnè-Ceresole Reale - Urgent work for a variant to eliminate the landslide and avalanche danger between Km. 74+400 and Km. 78+250 - II Lot MATTIODA 1996 S.S. n°28 "of Colle di Nava" -Province of Cuneo - Mondovì ring road project with connection to 28DIR - 564 and to A6 toll gate - 2° Lot: between S.S. 564 and S.P. Villanova-Mondovì CONICOS/SACIC 1996 S.S. n°28 dir - Branch: Mondovì-CarrùBastia - Province of Cuneo – Nov. 1994 flood damage – Final recovery : bridge reconstruction project over the river Tanaro to Km. 8+800 CONICOS 1996 Aosta ring road system - East Aosta Branch - Border (Pont Suaz) East Aosta junction sliproad variant within the requalification project of the Truck terminal area of Aosta - Working project LICIS 1996 S.S. n°117 "Centrale Sicula" – Itinerary North-South- Variant branch 7 access Strada Comunale Paravola - ex SNP26 delivered as NP1285 ANAS - PALERMO 1996 S.P. "Ghislarengo" – border with province of Novara - reconstruction work on Sesia river bridge - Tender LAURO 1996 S.S. n°12 dell'Abetone and of Brennero Construction work for variant of Isola di Scala I Extract from progr. 0 to progr. 3770 Working project SACIC 1996 S.S. N°453 "of Valle Arroscia" Neva river bridge restructuring between Km. 21+775 and Km. 22+970 at Bastia - conn 1470 GRASSETTO 1996 East-West connection of the built-up area of Cuneo and interconnection of suburban viability (S.S. n° 20 and 22) as variant GARBOLI-CONICOS 1996 S.S. n°117 "Centrale Sicula" - Branch: from Km. 0+000 to Km. 35+000 Province of Messina – Work on section between i Km.10+000 and 10+300 - conn NP A522 ANAS - PALERMO 1996 State Road n°117 "Centrale Sicula" Itinerary North-South - Lot B5 – Project for work between km. 38+700 and Km. 42+600 at the junction with S.S. 120 and the Nicosia junction conn NP1479 ANAS - PALERMO 1997 Interconnection between state roads n°9 n°235 - n°472 – Lodi East ring road GRASSETTO 1997 S.S.33 "del Sempione" - Branch: Gravellona Toce-Iselle - Province of Novara – Work on section between Km. 131+750 and state border Lot 1° conn NP1486 LAURO 1997 STUDIO CORONA 41 LOTTI STRADALI / ROAD LOTS 42 Province of Novara - S.S. n° 229-32-34111 and 211 - Working project on connection out of the built-up area of Novara – Lot 4: between S.S. 211 (Km. 47+150) and S.S. 11 (Km. 90+400) - conn NP1487 MARCOLI 1997 MINISTERO DEI LAVORI PUBBLICI (Ministry of Public Works)- General Direction of State construction and special services TECHNICAL DEPARTMENT City of ANCONA Reconstruction project - Law 12/08/1993 N.317 Working project to complete overpass and variant to S.S. 16 CONEROSOCIETA' CONSORTILE 1997 Comune of Messina – Project for the construction of the Giostra motorway junction, north motorway collector from Giostra to Annunziata junction , Annunziata motorway junction 3° Lot – North collector - Junction Annunziata GITTO 1997 Substitute road network infrastructure project of S.S. 125 "Orientale Sarda" Branch: Priamo-Capo Boi – Working project - Lot 1 C.I.R. COSTRUZIONI (COOPCOSTRUTTORI) 1998 S.S. n.20 “Colle di Tenda” - Branch: Cuneo-State border - Province of CN Variant project in the Cuneo section (C.so Monviso) - Vernante (bridge Siro) with exits on S.S. 21 and on the provincial road netwiork Lot 2° Sliproads in Roccavione and in Robilante UNIECO PREVE 1998 S.P. n.126 "Bubbio-Madonna of neve" Project for the construction of a new bridge on the river Bormida to Km.0+300 in Bubbio ALPE STRADE 1998 Highway road between Licata (S.S. 123) and Braemi river (access S.V. Caltanissetta-Gela) - Lot n. 8 - First Extract – Construction work for section between Callara and Cipolla at Km. 3+839.32 COOPCOSTRUTTORI 1998 S.S. 117 "Centrale Sicula" – Viability recovery in the section interrupted by a landslide between Km. 23+200 and 25+000 ANAS - PALERMO 1998 Grande raccordo anulare motorway. Work on the 3 carriegeways for each direction Lot 18b - from Km. 41+165 to Km. 43+280 - ex APP7 conn NPA110 GLEISMAC ITALIANA 1998 S.S. 131 "Carlo Felice" – Work on State road and to eliminate on-grade intersections - Exits of Mogoro COOPCOSTRUTTORI 1998 Borgosesia - New bridge on Sesia river to connect to S.S. 299 at Km. 42+200 in "Curva di Suora" C.I.S. 1998 Highway road between Licata (S.S. 123) and Braemi river (access S.V. Caltanissetta-Gela) – Working project for the construction of section between Cipolla and Caltanissetta-Gela at Km. 2+675,05 Lot 8 - 2° Extract HERA S.P.A. 1998 S.S.V. Licata - River Braemi - Section between the S. Antonio and Tallarita viaducts ANAS - PALERMO 1998 S.S. 120 “dell'Etna e delle Madonie” Province of Enna – Final and working project for urgent work needed to avoid the section with a landslide between 131+650 and 132+200 (172) conn NP1472 ANAS - PALERMO 1998 S.S. n° 184 "Delle Gambarie" – Construction work of S.S.V. "Gallico Gambarie" - Lot 1° (Section A3 - Prov. Pettogallico) COOPCOSTRUTTORI 1999 S.S. n. 106 "Jonica" - Branch: Km. 123+300 Km. 162+860 – Work for the construction of new bridge on the river Ancinale as prosecution to the Variant of Soverato and the junction with the "Trasversale delle Serre" COOPCOSTRUTTORI 1999 Working project - S.P. N°67 of Lovernatico Correction and widening work between Km. 8.800+900 as well as masonry LAURO 1999 Anas - Cagliari - Working project New SS 125 Orientale Sarda – Branch TerteniaTortolì - 2° Lot - 2° Extract S.C.A. 1999 Variant of S.S. n. 14 (Venezia Giulia) to the South of the city of San Donà del Piave - II° lot from S.P. n. 47 – Passarella area to S.P. n. 54 - Z.I. San Donà del Piave - Working project COOPCOSTRUTTORI 1999 Autonomous Province of Trento – Appointment of E. Marro as ocoordinator of work and update o the project of the Taio section ringroad: Segno-Taio on S.S. 43 P.A.T.494 1999 Working project for construction work on highway road S. Simone - S. Teodoro (Stazzareddu) - Lot 4 - Conn A452 ANAS CAGLIARI 1999 Working project for construction work on highway road S. Simone - S. Teodoro (Stazzareddu) - Lot 5 - Conn A453 ANAS CAGLIARI 1999 S.S. 231 "Santa Vittoria" - Branch: Cuneo- Bra - construction work on Fossano ring road - I° lot – Load testing GRASSETTO 1999 State Road n. 24 of Monginevro 1997 World Ski Championships – Work to access the section between Oulx-Cesana Torinese - I° Extract section between Oulx “Frazione Moretta” and Cesana Torinese Intervention of 1° phase - Completion work between the sections 1 and 62 Working project - conn A110 SEAS 1999 Connection road project between the internal areas Mussomeli, S.Giovanni Gemini and Agrigento-Palermo highway road (SS. 189) CIR COSTRUZIONI (DI VINCENZO) 1999 State road N. 229 "Lago d'Orta" - Branch: Novara-Gravellona Toce - Omegna ringroadProvince of V.C.O. - Urgent work for the reconstruction of Bridge on Rio Inferno LAURO 2000 Preliminary project of South-West Asti Ring road Sud-Ovest with connection between A21 "Torino - Piacenza" to toll gate of Asti Ovest and South Asti Ring road (S.S. N. 231) to cross Tanaro river through a viaduct and access on lot 2.1 of Asti-Cuneo in construction SITRACI S.P.A. 2000 Province of Torino viability sector II S.P. n° 1 “direttissima delle Valli di Lanzo” variant at Chialambertetto di Balme - Bridge "Balme" on Stura river PAVIMENTAZIONE MODERNA (ARTUSO) 2000 Working project on type III CNR of 7° lot of S.S. 106 "Jonica" GLEISMAC 2000 S.S. 260 "Picente" - Branch: Access S.S. 80-Province of Rieti border- Project for the construction of variant to Pizzoli up to the fork for Cagnano Amiterno - II° Lot ROMANA SCAVI 2000 Torino - Piacenza motorway crossings and complementary works for protection and for meteoric water runoffs in Volvera 1° branch 2° lot ATIVA S.P.A. 2000 Azienda Acque Metropolitane – Scalenghe Aqueduct- Urgent work to support and restructure the aqueduct bridge on the Sangone river in Beinasco A.A.M. 2000 STUDIO CORONA 43 LOTTI STRADALI / ROAD LOTS 44 Professional assignment to draw up a preliminary project for a new connection between Nizza-Canelli in substitution of S.S. n. 592- conn 1201 PROVINCIA di Asti 2001 S.S. 24 Monginevro – Work to access the section between Oulx-Cesana Torinese I° Extract – 2nd phase Completion works between the sections 62 and 204 MONGINEVRO scrl 2001 Working project of construction work on highway road S. Simone-S. Teodoro (Stazzareddu) - Lot 4 - Conn A320 FE.IRA (FERRARI) 2001 Working project of construction work on highway road S. Simone-S. Teodoro (Stazzareddu)- Lot 5 - Conn A321 IRCES 2001 Estimated metric calculation of work for the construction of variant in the built-up area of Porte at S.S. 23 "Colle di Sestriere" – Final project TOROC 2001 Final and working engineering project on the Torino ring road motorway system Bruere interchange with relative Safety plan APP97 ATIVA S.P.A. 2001 Widening of 4th lane in North ring road – Preliminary project - conn NP A523 ATIVA S.P.A. 2002 New S.S. 125 "Orientale Sarda" - Branch: Tertenia-S. Priamo - 3° Lot - 2° Extract: Murtas-Muravera – Detail project ROMANA SCAVI 2002 Working project - New S.S. 125 Orientale Sarda Branch: Tertenia-Tortolì - 2° lot - 3° Extract BALDASSINITOGNOZZI 2002 Variant to built-up area of Porte S.S. 23 Sestriere - APP 13 AGENZIA TORINO 2006 2002 S. S. n° 117 "Centrale Sicula" Work on section between Km. 10+000 and 10+300 ANAS - PALERMO 2003 Requalification work along S. P. n° 236 "Crevacuore-Sostegno" PROVINCIA DI BIELLA 2003 ARES Piemonte - Ring road slip road section of connection between S. R. n° 11 and S. R. n° 590 Gassino bridge ARES PIEMONTE 2003 Connection out of the built-up area of Novara between S. S. n° 299-229-32 - Lot 0 - Lot 1 - Preliminary project MARCOLI 2004 S. S. n° 33 "Sempione" variant between Varzo and State border ANAS - TORINO 2004 S. S. n° 655 "Bradanica" - 1° branch 3° lot "S. Maria d'Irsi" - Working project ALEANDRI 2004 S. S. n° 460 "Ceresole" - Branch: CaselleCeresole - Construction work of an artificial rock fall tunnel and work on hydraulic embankment PIANO LAGO CALCESTRUZZI 2004 Province of Reggio Calabria – Road section project of Bovalino-Bagnara S.T.I. 2004 Hydraulic embankment and environmental work at the Ivrea river junction - 4° lot COGEIS 2004 S. S. n° 16 "Adriatica" - Branch: Cerignola variant - Modernisation work ALEANDRI 2004 Variant Cossato-Vallemosso-Trivero and Variant Canton-Colombo-Mottalciata and Mottalciata roundabout LAURO 2004 Autonomous Province of Trento – Variants and work on S.S. 43 "Valle id Non" and Taio ringroad PROVINCIA AUTONOMA DI TRENTO 2004 S.S. 655 "Bradanica" - 1° branch - 3° lot "S. Maria d'Irsi" ALEANDRI S.p.A. 2004 Feasibility project o for the connection between the Fossano Variant (San Sebastiano) and the Asti-Cuneo motorway toll gate SITRACI 2004 S.S.131 "Carlo Felice" Highway road – Work on state road and to eliminate on-grade intersections in the built-up area of Sanluri ALEANDRI S.p.A. 2004 Province of Imperia - Pieve di Teco - S.S. 28 "Colle di Nava" – Work on variant in the built-up area of Pieve di Teco LAURO 2004 Work on sect. III C.N.R./80 from Km. 10+150 of S.S. 99 to the access with S.S. 7 near Matera 3° branch Altamura-Matera ALEANDRI S.p.A. 2005 Province of Imperia - Chiusavecchia S.S. 28 "Colle di Nava" - Branch: Ponte di Nava - Imperia – Working project of Chiusavecchia variant CARENA S.p.A. 2005 S.S. 7 "Appia" – Road work to the type III° section of the CNR norms - GrottaglieBrindisi Section - Lot VI° from km. 719+220 to km. ALEANDRI S.p.A. 2005 ARES PIEMONTE - Poirino variant at S.R. 29 COGEFA S.p.A. 2005 Construction work of variant to the built up areas of of Cureggio and Borgomanero - Lot 2 Work for the completion of the section between ex S.S. 32 dir and ex S.S. 142. CERUTTI LORENZO S.r.l. 2005 S.S. n. 106 "Jonica" - Branch: km. 123+300 *km.162+860 Work for the construction of new bridge on the river Ancinale EUROPEA 92 S.p.A. 2005 S.S. 45bis "Gardesana Occidentale" Branch: Salò - Compartment border Urgent work project for the construction of "Punta Forbisicle" tunnel from progr. Km 92+586 to progr. Km 93+432 GARDESANA S.C.A.R.L. 2005 Working project to build the ring road in the built-up area of Chiusole on S.P. n. 90 Right Adige CARENA S.p.A. 2008 Province of Ancona - S.S. n° 76 "Val d'Esino" - Junction for the connection of the intermodal centre of Jesi ALEANDRI S.p.A. 2008 S.S. n° 39 "Passo di Aprica" - Branch: Tresenda-Edolo – Project for road work and carriageway widening CIR S.p.A. 2009 Urban road from Via Lungomare Canepa to Piazza Savio, sliproad with ANAS viability on right bak on the Polcevera river and civil works ATI: CARENA S.p.A. CODELFA S.p.A. OMBA 2009 S.S. n° 17 Ter "Dell'Appennino Abruzzese and Appulo-Sannitico" - Branch: Antrodoco - Navelli - Variant South of the built-up area of L'Aquila – Slip road between Mausonia consortium and S.S. 17 ter 2° lot LIS S.p.A. 2009 Variant to the built-up area of the City of Alba for the connection between the regional road for Cortemilia-Savona and the Asti-Cuneo-Torino ring road "3° Bridge" CITTA' DI ALBA 2010 Construction work on the conduct from Monte Ciminiello turret to the fence of the new tank of San Paolo, including the interconnection chambers with the existing scheme at the Monte Ciminiello turret and the Monte Maialino turret and all the works relating to loading and vent – Sinni Aqueduct – 1° Lot SALVATORE MATARRESE S.p.A SIMEONE Nicola & Figlio S.r.l. 2010 Construction work of South-East variant in the built-up area of Romagnano Sesia along the S.P. n° 299 "of Valsesia" LAURO S.p.A. 2011 New link road connecting the new Carmagnola Sud toll gate on the Torino-Savona A6 motorway with Ex S.S. 20 and Ex S.S. 661 ICG2 S.p.A. 2011 STUDIO CORONA 45 GALLERIE TUNNELLINGS DESCRIPTION CONTRACTOR YEAR S.S. 340 "Regina", branch: MenaggioState border. Works from Cima di Porlezza Km. 46+200 to State border Km. 52+300 - 1° lot from S. Mamete to State border of progr. 50+690 to progr. Km. 52+300 CARRIERO & BALDI 1991 Morish-Jerusalem Development Company Ltd - Route 4 "Mai Naftoach Tunnel" GITTO 1992 Motorway Messina-Palermo, Extension Patti-Buonfornello, 2° branch: S.Stefano di Camastra-S.Agata di Militello, section: S.Agata di Militello-Caronia, lot 24 bis "Pizzo Turda" ITINERA 1992 GITTO 1992 TODINI 1992 Modernisation work of S.S. from Darfo to Edolo, variant in the built-up areas of Capo di Ponte , Sellero and Cedegolo 5°-6° lot from Km. 25+751.82 to Km. 34+355,68 COSIAC 1992 Motorway Torino-Bardonecchia-Susa (Autoporto/truck terminal)-Rivoli, branch IV: Susa (Autoporto/truck terminal)Bussoleno, new working project of section between Km. 0+000 and Km. 5+508.19 for variation of new layout I.N.C. 1992 S.S. 859 of Valle Antigorlo-Formazza, variant between Km 27,400 to Km 29.570 to eliminate series of hairpin curves in "le Casse" ITINERA 1992 S.S. 280 "dei due mari", work to confer motorway characteristics to the branch from Km. 18+200 to Km. 25+800 SACIC 1992 S.S. 33 "of Sempione" - S.S. 859 "Valle Antigorio a Formazza", Completion work with the construction of "Pontemaglio" tunnel LAURO 1992 S.S. 1 Aurelia, work on Follonica-Cecina section , lot VI B FEDERICI 1992 S.S. 47 of Valsugana, province of Trento, project for additional lane work for Ponte Alto-Rio Farinella section SALGET 1992 S.S. 89 Garganica, high way road itinerary from Poggio Imperiale A14 toll gate to Visate, branch: Rodi Garganico-Vico of Gargano, lot 1 Extract B LALLI 1992 Connection between Bardonecchia and Rivoli- Susa (Autoporto/truck terminal)Rivoli, branch IV: Avigliana-Rivoli, lot 31: from Km. 32+206.64 to Km. 34+602.00 ITINERA 1992 Variant out of the built-up area of Gavi Ligure for connection between S.P. 161 "Cranna" and S.P. 180 "Val Lemme" ITINERA 1992 S.S. 36, Construction work project of connecting road between thoroughfare of Lecco and Valsassina S.S. 27 of Gran S.Bernardo, branch: Aosta-Swiss border, Construction work project for the variant of Gignod between Km. 8+175 and Km. 7+783 CARIBONI 1992 Messina-Palermo motorway, Extension Patti-Buonfornello 2° Extract: S.Agata di Militello-Caronia, lot 25 "Tunnel Caronia" ITINERA 1993 S.S. n°25 "of Valtrebbia" - Work from Km. 40+300 to Km. 40+900 – Serra tunnel GITTO 1996 S.S. n°45 "Val Trebbia" - Work from Km. 40+300 to Km. 40+900 – Serra tunnel DI PENTA 1994 Urgent work on the flyover floor at Km. 184+ 870 and lowering of the carriageway between the progressive 184+920 and 184+600 MONTEBRUNO 1994 Messina-Palermo motorway, extension Patti-Buonfornello, 2° extract: S. Agata di Militello-Caronia "Piano Bandiera", lot 23 ter Access to 1997 World Ski Champioships , Val di Susa-Oulx ringroad, access from Sauze d'Oulx to connection to A32, lot 1 46 STUDIO CORONA 47 GALLERIE / TUNNELLINGS 48 S.S. n°28 "Colle di Nava" - Urgent work for the construction of a rockfall tunnel between Km. 57+650 and Km. 57-820 for the construction of the road hit by a landslide ex SNP14 conn NP457 CICUTIN 1995 S.S.n°459 "Valle Antigorio e Formazza" Consolidation work out of a crater on the vertical of a tunnel at progr. 0+659 at the south entrance for the construction work variant between Km.27+400 and Km.29+570 to eliminate a series of hairpin curves in the area of "Le Casse" EDILCONSOL 1995 S.S.n°339 "Cengio" - Branch: Cortemilia Compartment border - Urgent work for the construction of rockfall tunnel at Km.20+400 PORTALUPI 1995 Messina-Palermo Motorway - Tunnel of Caronia 1 - Lot 25 - 1° Extract GITTO 1996 Urgent work to consolidate a section of the tunnel in Gavi Ligure (connection SSPP 160-161) damaged by a calamitous event in Nov. 1994 LICIS 1996 S.S. n°142 "Biellese" - Branch: BiellaRolino Construction work of Variant between Biella and Rolino - 3° Lot of S.P. of Castellato Cervo to S.P. of Buronzo – Overall working project MATTIODA S.p.A. 1996 Messina-Palermo Motorway – Extension Patti-Buonfornello - Working project 2° branch: S.Stefano di Camastra-S.Agata di Militello - Section: Caronia-S. Stefano di Camastra - Lot 25bis "Pagliarotto" P & P S.C.A.R.L. (C.E.C.) 1997 Messina-Palermo Motorway – Extension Patti-Buonfornello - Working project 2° Branch: S.Stefano di Camastra- S. Agata di Militello - Section: Caronia- S.Stefano di Camastra - Lot 26 "Portale" P & P S.C.A.R.L. (C.E.C.) 1997 Torino-Ivrea-Quincinetto - Ivrea-Santhià Torino ring road motorway system Motorway ramification Orbassano Pinerolo Completion branch functional for the Colombiadi conn. NP1365 ATIVA S.P.A. 1997 S.S. 418 "Of Serra" - Project for functional recovery work of Serra tunnel facing BETTI - BERTINO 1997 Motor-and-truckway of Cisa S.p.TO. – Parma Modernisation work of S.S: n°308 and n°523 between Ghiere and Berceto and the Bertorella crossroads under ANAS (interconnection with Cisa A15 motorway) Construction project 2° section from Roccamurata to Ostiaparmense GRASSETTO 1997 S.S. n°301 "of Foscagno" - Branch: Passo Foscagno - Livigno – Survey on urgent work to eliminate danger of landslide through an artificial tunnel between progressive Km. 25+200 and Km. 25+700 LAURO S.p.A. 1997 Motorway Brennero - Trento – work on recovery on cardano tunnel OBEROSLER 1997 Motorway ME-PA - 2° branch - S.Stefano di Camastra - S.Agata di Militello Section Caronia - S.Stefano di Camastra Lot 26bis "Canneto" TE.DI.G. scarl 1997 Railway line F.S. Torino-Ceres - Satti Torino Verification project. Station bay piazzali of tratta alta CFT 2000 1998 S.S. 112 "d'Aspromonte" - Project for work needed to eliminate danger between Km. 61+000 and Km. 62+100 Tunnel "C" COOPCOSTRUTTORI 1998 S. S. n° 21 "Colle della Maddalena" Final project for pilot hole ANAS - TORINO 2003 Automatic subway in Torino Engineering line, test of prefab segments TEC S.r.l. 2003 MATTIODA S.p.A. 2004 Creation of variant S.S. 589 dei Laghi di Avigliana in Avigliana and Trana - Lot 2 SITALFA S.p.A. 2004 Province of Imperia - Pieve di Teco S.S. 28 "Colle di Nava" – Work and modernisation of Variant in the built-up area of Pieve di Teco LAURO S.p.A. 2004 Province of Imperia - Chiusavecchia S.S. 28 "Colle di Nava" - Branch: Ponte di Nava - Imperia – Working project of Chiusavecchia variant CARENA S.p.A. 2005 Automatic subway in Torino Line 1 South Extension Section Porta Nuova – Marconi COGEFA S.p.A. LAURO S.p.A. 2005 S.S. 45bis "Gardesana Occidentale" Branch: Salò - Compartiment border Project for urgent work for the construction of "Punta Forbisicle" tunnel from Km 92+586 to Km 93+432 GARDESANA S.C.A.R.L. 2005 Modernization and implementation of safety measures on S.S. 23 of Sestriere from Perosa Argentina to Cesana Torinese. Fenestrelle tunnel MATTIODA S.p.A. 2006 Sicilian Region - Favara di Burgio aqueduct restructuring – Santa Rosalia Ribera tunnel FABUR Soc. Cons. a R.L. 2007 Completion project of motorway collector and of the Annunziata junction COMUNE DI MESSINA 2007 Work to speed up the Palermo - Agrigento railway line - I° Extract CARIBONI STRADE E GALLERIE S.p.A. 2007 Working project to create a ring road in the built-up area of Chiusole on S.P. n. 90 Right Adige CARENA S.p.A. 2008 ASR 47/04 - Salerno – Reggio Calabria motorway - Branch 2° - Section 4° - Lot 3° from Km. 221+443 to Km. 225+800 – Modernisation work and compliance with category 1A of the C.N.R./80 norms CARENA S.p.A. 2008 New mechanised system of transport to connect c "Via Cantore - Villa Scassi" COMUNE DI GENOVA 2010 Work on S.S. 24 of Monginevro in the Cesana Torinese - Claviere section including the crossing in the built-up area of Claviere STUDIO CORONA 49 OPERE FERROVIARIE RAILROAD LOTS 50 DESCRIPTION CONTRACTOR YEAR Cuneo-Ventimiglia line, area of Ventimiglia and viaduct Scarassoui in France S.C.A. 1973 Torino-Milano line, flyover to Saluggia S.C.A. 1975 Torino-Genova line, flyover to Villanova VIALIT 1974 Railway flyover in Via O. Vigliani to Torino VIALIT 1979 Torino-Trofarello line, quadruplication VIALIT 1980 Asti-Ovada line, flyover to Mongardino LICIS 1974 Bra-Alba line, artificial tunnel SANTINI 1975 Santhià-Arona line, bridge on Cervo SICOS 1975 S. Paolo of Torino rail to road interchange CAROLA 1976 S. Giuseppe-Acqui line, railway flyover Km. 29+170 and Km. 28+417 ALPE STRADE 1977 Firenze-Bologna line, recovery and widening works GEOTHEM 1977 Railway offices extention in Porta Nuova in Torino VITTORIA 1977 Torino-Lanzo line, railway flyover to Venaria VITTORIA 1977 Genova-Ventimiglia line, Imperia station supporting walls DAMONTE 1977 Milano-Venezia line to Verona, repair work CAVE STRADE 1977 Cantalupo-Cavallermaggiore Line, artificial tunnel MARCARINO 1977 Torino-Genova Line, Torino-Trofarello quadruplication CARENA 1978 Cuneo-Ventimiglia line, avalanche shelter Km. 32+534 CARENA 1979 Torino-Modane line, Exilles rockfall station ASFALTI SINTEX 1979 South Ring road underpass, Orbassano switch-yard CIS 1979 Mores-Chilivani line , flyover Strada Provinciale EDISTRA 1979 Genova-Savona line, railway flyover to Voltri BERTOLO 1979 Asti-Monferrato line, iron bridges RUSCALLA 1979 Torino-Modane railway, Rivo Combassa bridge protection and construction of two artificial tunnel sections CIS 1979 Chilivani railway line EDISTRA 1980 Novara station suspended tank LICIS 1983 Vercelli - Project works to recover the Belvedere railway flyover LAURO 1994 Concession for the work necessary to modernize and potentiate the railway Torino-Ceres S.S.E. Germagnano – railway flyover S. Maurizio – Caselle undersground station ITINERA 1996 STUDIO CORONA 51 OPERE FERROVIARIE / RAILROAD LOTS 52 PA-ME railway line – Creation of double track in section Pace di Mela Rometta from Km. 1+411.66 to Km. 4+858.46 I.R.A. 2000 U.O. Tunnel - Working project – PalermoMessina railway line – Messina-Patti doubling up - Section : Rometta-Pace di Mela from Km. 4+326.56 to Km. 5+072.56 S.C.A. 2000 Torino-Ceres railway- Recovery of flood damages on 13/10 to the bridge at 7+995 in Stura di Venaria SATTI 2000 SATTI S.p.TO. Turin automatic subway Line 1 Section Fermi-Pozzo Strada Lot 3° Yard project consulting services GRASSETTO 2001 Ferrovie dello Stato - Line: Milano-Napoli Section: Roma-Napoli – Test Ing. RODRIQUEZ 2001 Turin automatic subway – Line 1 Section: Deposit-Fermi ITER 2001 PA-ME railway line - Creation of double track in section Pace di Mela Rometta from Km. 0+000,00 to Km. 1+411,66 FE.IRA (FERRARI) 2002 CAV. TO. MI. - Junction of Settimo Torinese on A4 – Supporting walls CAVSETTIMO 2003 Palermo-Messina railway line Creation of civil works for Rometta station from Km. 8+386,43 to Km. 9+410,23 New underpass of Rometta FE. IRA 2003 Railway line speed-up Palermo -Agrigento - I° Extract CARIBONI STRADE E GALLERIE S.p.A. 2007 Plano-altimetric project and construction of 1st subway line of Almaty in Kazakhstan MUNICIPALITA' DI ALMATY (KAZAKHISTAN) 2008 STUDIO CORONA 53 COMMESSE INTENAZIONALI INTERNATIONAL WORKS 54 DESCRIPTION CONTRACTOR YEAR Port of Monaco pier Ing. IORI 1970 Punta Arenas Pier in Argentina IMPRESIT 1970 Monaco hospital landslide Ing. IORI 1970 Hotel Bristol, Monaco Principality Ing. IORI 1971 Condominium "Bel Air", Monaco Principality Ing. IORI 1971 Immeuble "H", Monaco Principality Ing. IORI 1971 Condominium "Les Caravelles" to Monaco Principality Ing. IORI 1971 Basketball stadium covering, Monaco Principality Ing. IORI 1971 Prisco port in Perù, general markets IMPRESIT 1971 Aluar plant of Puerto Madryn, Argentina - Chubut IMPRESIT 1972 Residential area in Riyadh, Saudi Arabia GENGHINI 1972 Tank in Annata, Algeria COSTRA 1972 Tiarret plant in Algeria FIAT ENGINEERING 1972 Depuration plants in Frejus, France Ing. IORI 1973 Sewage system of Tripoli, Libya Ing. PIA 1973 Gaz de France, methane pipeline in France INCISA 1973 Italian Embassy in Kabul-Afghanistan, structural engineering design Arch. BRUNO 1984 State of Israel, Ministry of Construction & Housing, Public Works Department, Road n. 60 Har Gilo Tunnel GITTO 1992 Moriah, Jerusalem Development Company Ltd, Route 4, "Mai Naftoach Tunnel" GITTO 1994 Tunisia – Societè Nationale des Cherrins de Fer Tunisien – Work on mountain range Oued Siliana crossing of line 6 pk 105:821 ITINERA 1994 Tender - river Agueda viaduct SACIC 1994 Moriah - Jerusalem Developement Company Ltd - Route 4 - "Mai Naftoach Tunnel" GITTO 1994 Hoce - Arja Vas Motorway – Slovenske Konjice subsection ITINERA 1995 Singapore light subway DEAL 1995 Construction of wharf caissons in Mikonos port LUNGARINI 1996 Construction of due bridges and parallel work in the section Gournes-Penisola of the northern road axis of Southern Crete – Bridges over the river Aposelmi ITINERA 1996 Wadi Haddada Tunnel, Amman GITTO 1996 Taiwan Area National Expressway Engineering Bureau - Ministry of Trasportation and Communications Repubblic of China Second Freeway extention project I.N.C. 1997 The Hoshemin Kingdam of Jordan - Ministry of work and irrigation, water authority of Jourdan Improvement of the Anman-Alsmara Waste water project construction of Macka tunnel GITTO 1997 Motorway Koper-Lendava Tender consultancy services GRASSETTO 1998 Crinikal viaduct design ITINERA 1998 Wadi - Mudiq - Gillay tunnel C.E.C. 1998 AC Koper-Lendava with adjoining arms Section: 7 Blagovica-Šentjakob - SubSection: 7/2 Lukovica-Šentjakob from 0.000 km 11.660 km - Consulenza per offerta of gara GRASSETTO 1999 Autoroute Est-Ovest - Troncon Lakadara Uaison RN5 - Lot "Tunnel" C.E.C. 2000 Bridge on Orashi river GITTO 2000 Rieka-Zagabria Motorway - Lot 1° (Tender) COOPCOSTRUTTORI 2001 State of Israel - Kikar Zahal Tunnel in Jerusalem C.E.C. 2001 Project Bodo Bonny Road in Nigeria Final, working and yard project C.E.C. 2003 Federal Ministry of Works Mabushi – Abuja Project Itidigi Bridge and Approaach Roads Abba Omega - Itidigi Ediba - Ugep Road Route 44 (F113), in cross river state C.E.C. 2003 STUDIO CORONA 55 COMMESSE INTERNAZIONALI / INTERNATIONAL WORKS 56 Preliminary study of a road tunnel near Makeni C.E.C. PLT 2004 Intercomunal collector of Algeri–Geotechnicstructural consutancy services assignment GI.CO. S.p.A. 2004 Preliminary study for Benin City overpass C.E.C. PLT 2004 Shopping Centre C.E.C. PLT 2004 United Republic of Tanzania - The board of trustees of the national social security fund Tender no. 009 of 2003/04 - Proposal technical for the Kigamboni Bridge Project Dar Es Salaam C.E.C. PLT 2005 Engineering for bridge on the Highway Freetown - Conakry - Sierra Leone C.E.C. PLT 2005 Mbiama - Warri Road C.E.C. PLT 2006 Gitto Abuja Tower CORONA NIGERIA 2007 Romania - Directia Regionala Craiova Lot 6 - DN 67 Km. 39+076 Work on bridges COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE S.A 2007 Romania - Directia Regionala Craiova Lot 17 - DN 67B Km. 137+481 Work on bridges COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE S.A 2007 Plano-altimetric project and construction of 1st subway line of Almaty in Kazakhstan MUNICIPALITA' DI ALMATY (KAZAKHISTAN) 2008 Dakar Tower CORONA SENEGAL 2009 Consultancy services to European community Contract Lot 2 - Transportation and Infrastructures COMUNITA' EUROPEA 2010 Bangalore Metro Rail Project - Consultancy for City Market - Chickpet stations tender GEODATA S.p.A. 2010 Chennai Metro Rail - Phase 1 Consultancy for Lot 1 tender GEODATA S.p.A. 2010 Cile-Argentina railway line- Study of alternative plano-altimetric layout SEA CONSULTING Srl 2010 Working project Orastie-Sibiu motorway Lot 2 STRACO S.p.A. 2011 Nembe-Brass Road and Ugbo-Ughoye Road Works of art design MORENO PLT 2011 CENTRALI NUCLEARI NUCLEAR POWER STATIONS DESCRIPTION CONTRACTOR YEAR Nuclear power station of Trino Vercellese Seismic requalification and new office building. Engineering of guarantee and quality regime ENEL (Milano) 1984 "E. Fermi" power station- Trino Vercellese Controlled Area Entrance restructuring Auxiliary building, electric plant project and thermo-ventilation service of the plant RECCHI (Torino) 1985 Provisional information centre Trino Vercellese RECCHI (Torino) 1985 Sezione longitudinale - edificio del reattore nucleare Longitudinal section - building for nuclear reactor STUDIO CORONA 57 DIREZIONE LAVORI SUPERVISION 58 DESCRIPTION CONTRACTOR YEAR Lingotto restructuring, works on II° phase Project: Renzo Piano Building Workshop works amount: 256 billion, General and structural supervision SOC. LINGOTTO 1992 Structural supervision LEVI 1994 a General Supervision consortium (and structural) + mis. and contabil. + daily assist., Work to complete 3rd phase Lingotto D.L. III FASE 1999 Stream intervention for Ceronda bridge reconstruction in Venaria – Supervision and engineering and execution safety coordination SATTI 1999 General supervision Lingotto ground level parking lot (60,000 mq) area to the right of the railway with connected viability LINGOTTO 2000 A6-A21 Connection (Asti-Cuneo) Branch 1 - Lot 1 – Assignment to Giovanni Corona as Works Director SATAP 2000 A6-A21 Connection (Asti-Cuneo) Branch 1 - Lot 1 - Assignment to Giovanni Corona as Works Manager SATAP 2000 General Supervision consortium (and structural) + mis. and contabil. + daily assist., Work to complete 3rd phase Lingotto D.L. IIIa FASE 2000 Autonomous Province of Trento – Assignment to E. Marro as coordinator during work and update of exec. project of Taio ring road - Section: Segno-Taio on S.S. 43 P.A.T.494 2001 Province - S.P. n. 27 "Castello d'Annone Nizza Monferrato" – Widening of bridge on Tanaro river in Rocchetta Tanaro PROVINCIA DI ASTI 2001 C.so Spezia-C.so Sebastopoli underpass COMUNE DI TORINO 2001 Torino-Alessandria-Piacenza Motorway Work on Tanaro river viaduct foundation for the safety di the Alessandria built-up area SINA 2001 Widening di bridge on Po river in Casale Monferrato CITTA' DI CASALE MONFERRATO 2001 A6-A21 ASTI-CUNEO Connection Branch 1 Lot 1 – Static testing assistance ITINERA 2001 Erice cablweway - Consultancy services for project validation PROVINCIA DI TRAPANI 2001 Autonomous Province di Trento - variants and work on S.S. n°43 "Valle di Non" - Branch: Mollaro-Taio and Taio ring road P.A.T. 2002 Ski-lifts - New Garnel (lot 3) Fraiteve 3 (lot 4) Fraiteve 3 - SUPERVISION New Garnel – Supervision AGENZIA TORINO 2006 2002 Turin Subway – Plant to produce prefab ashlars T.E.C. 2002 General – Assistance supervision assignment CONSORZIO 2002 Colle Bercia ski-lifts(lot 5) – La Sellette (lot 6) - La Sellette supervision - La Coche supervision AGENZIA TORINO 2006 2002 Palasport - Oval Lingotto Design and general supervision HOK groupleader supervision AGENZIA TORINO 2006 2002 Plano-altimetric survey assignment, measurement and accounting supervision, execution phase coordinator for work ex D.Lgs. 494/96 s.m.i. Sky Lodge La Sellette ski-lifts AGENZIA TORINO 2006 2003 Plano-altimetric survey assignment, measurement and accounting supervision, execution phase coordinator for work ex D.Lgs. 494/96 La Coche-Serra Granet-Colle Bercia ski-lifts AGENZIA TORINO 2006 2003 Plano-altimetric survey assignment, measurement and accounting supervision, execution phase coordinator for work ex D.Lgs. 494/96 R02 Fraiteve 3 ski-lifts AGENZIA TORINO 2006 2003 Plano-altimetric survey assignment, measurement and accounting supervision, execution phase coordinator for work ex D.Lgs. 494/96 R04 New Garnel ski-lifts AGENZIA TORINO 2006 2003 Plano-altimetric survey assignment, measurement and accounting supervision, execution phase coordinator for work ex D.Lgs. 494/96 R14 Trebials ski-lifts AGENZIA TORINO 2006 2003 Bridge widening on Tanaro river in Rocchetta Tanaro PROVINCIA DI ASTI 2003 Trapani-Erice cablecar PROVINCIA REG. 2003 Engineering for the completion of the section Catania-Siracusa motorway – Tender consulting services BONATTI 2003 City of Casale Monferrato - Extension work on road bridge river Po Supervision COMUNE DI CASALE 2004 Variants and work on S.S. n° 43 “di Valle di Non” - Supervision PROV. AUTONOMA 2004 DI TRENTO Final and working engineering. 494/96 Safety coordination, supervision and assistance to carry out the necessary maintenance tests to consolidate the old bridge on the River Po against eroding agents COMUNE DI CASALE 2004 Two-chair fixed attachment lift Limonetto Pernante COMUNE DI LIMONE PIEMONTE 2004 Work connected to final engineering of 4-seat chairlift with automatic attachment "Cabanaira" in Limone Piemonte COMUNE DI LIMONE PIEMONTE 2004 Scope Spina 3 - Z.U.T. 4.13 – Comprensorio Savigliano S.N.O.S. S.p.TO. – Spaces for new Development Opportunities – Requalification of ex-Officine Savigliano to create high technological content businesses - Lot UMI I-C ROSSO GEOM. FRANCESCO & FIGLI S.p.A. 2005 S.R. 10 bis External ring road connection to Turin conurbation (East ring road ) Connection section between S.S. 11 and S.S. 590 Ponte Gassino S.C.R. PIEMONTE S.P.A. 2008 Top station - Monte Bianco cable car Helbronner - Nuovo rifugio Torino SOCIETA' FUNIVIE MONTE BIANCO 2011 PROG. LINGOTTO DI TRAPANI STUDIO CORONA 59 EDIFICI CIVILI CIVIL BUILDINGS 60 DESCRIPTION CONTRACTOR YEAR FIAT, Via Biscaretti real estate GUERRINI 1970 FIAT Mirafiori, warehouse GUERRINI 1970 FIAT Mirafiori, ampliamento meccanica GUERRINI 1970 INCA plant in Volpiano CARRA' 1970 FATES plant in Occhieppo CANTONE E MAGGIA 1970 Alberto Bracco plant, Cossato CANTONE E MAGGIA 1970 Nova Tant plant in Masazza CANTONE E MAGGIA 1970 Chopont plant in Pont St. Martin - Bertand plant in Masazza CANTONE E MAGGIA 1970 T.I.F.T. plant in Masazza CANTONE E MAGGIA 1970 Bona and Zumaglia forniture factory CANTONE E MAGGIA 1970 Sozzi body shop, Biella CANTONE E MAGGIA 1970 Industrial plant to Villanova d'Asti VIALIT 1970 Cement plant of Nuraminis, Cagliari VIBROCEMENTO SARDA 1971 FIAT, aircraft plant enlargement CARRA' 1971 FIAT Ferriere iron foundry, Bonafous department CARRA' 1971 Roncagliene plant in Nichelino BORRIONE 1971 FIAT, Rivalta plant MARCORA 1971 SILCA, Cassini, tine accumulation BELOIT ITALIA 1971 FIAT, iron foundry plant enlargement in Turin CARRA' 1971 Moncalieri power plant A.E.M. 1971 Soc. Naz. Cogne-Aosta, rolling mill VIBRANDO E PIGNATARO 1971 Materials test laboratory enlargement POLITECNICO 1971 Compressed light cement shed CEMENTERIA PRESA 1972 Plant in Chivasso, painting LANCIA 1972 Plant in Chivasso, press production unit LANCIA 1972 Plant in Chivasso, thermal power plant LANCIA 1972 Branch in Torino LANCIA 1972 Branch in Palermo LANCIA 1972 Branch in Verona LANCIA 1972 Branch in Bologna LANCIA 1972 Branch in Padova LANCIA 1972 Branch in Bari LANCIA 1972 S. Pietro neighbourhood in Biella MAGGIA 1973 Sassone plant in Ronco Biellese MAGGIA 1973 Apartment block in Parco MAGGIA 1973 Low building Olimpic 2 MAGGIA 1973 Swimming pool in Prè St. Didier FOLLIOLEY 1973 MTM plant, Masazza EDIL 2000 1973 Giasmina plant, Masazza EDIL 2000 1973 Warehouses in S. Benigno Canavese GARETTO 1973 Sports forum in Vado Ligure GARETTO 1973 Frassati gym in Pollone DELSIGNORE 1973 Building complex Cielo Alto in Cervinia DELSIGNORE 1973 Ceramic tiles plant in Pisa DELSIGNORE 1973 New remand prison in Torino NAVONE 1973 Industrial buildings in Nichelino NAVONE 1973 Fiber technic plant in Robbio BARATTO 1973 Shed enlargement in Robbio BARATTO 1973 Shed enlargement, 1974 BARATTO 1973 IPAI building in Vercelli BARATTO 1973 '78 plant and warehouse in Robbio BARATTO 1973 Bank of Italy, branch in Firenze DESSI' 1973 Sole Motorway, Piacenza Sud station DESSI' 1973 Eridania company, storage in Melzo DESSI' 1973 New remand prison in Aosta DESSI' 1976 Silos from 20.000 mc., plant in Russi, Eridania DESSI' 1973 Silos from 26.000 t.to., S.Pietro Casale for Eridania DESSI' 1973 Magnolia apartment block in Moncalieri BALLOR E VOGLIOTTI 1973 Industrial plant and offices in Leinì VITTORIA 1973 Rumiana Sud plant in Cagliari VIBROCEMENTO SARDA 1973 Steel mill in Susa ASSA 1973 Steel mill Tirreno in Milazzo RECCHI 1974 Parking lot for Imperia Hospital BERTOLO 1975 Warehouses renovation in Sanremo BERTOLO 1975 Prefabricated shed in Saluzzo COGIBIT 1977 Warehouses renovation in Imperia AGNESI 1976 Taormina parking lot, Messina-Catania motorway SI.GE.CO 1977 Vertek plant in Condove C.I.S. 1978 Fiat aircrafts hangars in Caselle C.I.S. 1978 Agricultural products shed in Modica, Sicilia ALLIBRIO 1979 Nursery in Torino in Corso Emilia BORINI 1979 Textiles Study Centre, Biella BORINI 1980 Nursery in Torino in Via Lanzo BORINI 1981 Junior high school in Settimo Torinese BORINI 1981 New Agency in Vercelli IST. BANC. S.PAOLO 1979 Service center in Via Lugaro in Torino IST. BANC. S.PAOLO 1975 New Agency in Ivrea IST. BANC. S.PAOLO 1980 New Agency in Ovada IST. BANC. S.PAOLO 1978 New Agency in Avigliana IST. BANC. S.PAOLO 1978 New Agency in Rivoli IST. BANC. S.PAOLO 1982 Building in Via S.Teresa in Torino BANCA COMIT 1981 Federal German School in Roma B.B.D. 1980 German Embassy at Vaticano B.B.D. 1980 Villa Benedicenti in Chieri HUTTER 1979 Sport hall in Cremona R.D.B. 1978 Cairo Montenotte Nursery LOMBARDINI 1978 Warehouse in Torino EDILVICTOR 1974 Technical-Industrial Institute in Biella ZERBOLA 1980 Underground parking lot in Torino BORINI 1982 Missile shed in La Spezia SI.GE.CO 1981 Floriculture Marketing Center, Sanremo BETONFER 1983 Subalpina Bank, Torino headquarters and central branch ABRATE 1985 Giaione farmhouse in Via Guido Reni, Torino MENARDI 1985 Nuova Italsider, Bagnoli (Napoli), production units moving 02-325 t/g SACCO 1986 S.S. 36, construction of operation center Higway 36 (C.O.S) SI.GE.CO 1988 Architectural arrangement of Monte Bianco tunnel entrance FOLLIOLEY 1990 STUDIO CORONA 61 EDIFICI CIVILI / CIVIL BUILDINGS Arch. Paolo Portoghesi 62 Cuorgnè Municipality- Highschool complex "Jervis" enlargement for new premises of Professional Trade Institute and adjustment for Trade and Surveyors Institute "XXV Aprile" COOPERATIVA SABAZIA 1993 Construction of new headquarters of Regional Inspectorate of Fire Brigade in Piemonte and Valle d’Aosta FARESINA 1993 Electric substations in Martenitto and Borgaro – South-west substation plant in Moncalieri A.E.M. 1994 Castrovillari Municipality(CS) – Urban redevolpment with of the historical centre SI.GE.CO 1994 Connection between Bardonecchia and Rivoli Section III: Deveys-Susa – Ventilation plant n. 2 – Building for the air intake at the top of the chimney I.N.C. 1994 Enlargement of road of corso Duca degli Abruzzi in the area near ex O.G.R. - connection to to exisitng premises TEKNE 1995 Renovation and conversion of the airport area in Aosta LAURO 1995 Locana Municipality – Hydroelectric plant of San Lorenzo, Torino province, structural working project MATTIODA 1995 Industrial building superelevation, offices area SOC. S. DAMIANO 1996 Sanremo Municipality - Imperia province, project for interior transformation of the existing building, aimed to apply a different use of the inside locations VIALIT 1996 Liguria Region - Imperia Province, Taggia Municipality – Building for tertiary residential purposes with 2 levels of garage to be realized in Arma di Taggia, in the area BR 15 of S.U.T.O VIALIT 1996 Industrial complex in Viale di Ghisallo 16 Milano - Property RHIFIM S.p.TO. Milano Renter RHIAG S.p.TO. Milano RHIAG S.P.A. 1997 Unieco depuration plant - Azienda Po Sangone – Final filtration system of water treatmement plant UNIECO 1997 Working project plant in Favara (AG) for prefabricated elements production IPE 1997 Court of Torino technical verification quote n°67/98 - Causa Lingotto Srl/ Of-Favero Spa/Maltauro Spa LINGOTTO 1998 Consulting service Mr. Mottino to Mr. Neirotti for Lingotto project Fiat centenary ING. NEIROTTI 1998 Piemonte Region - Vercelli Province, Vercelli Municipality- Archdiocese of Vercelli development through conservative renovation of the Vercelli Episcopio destined as Museo of Tesoro of Duomo and Archivio Capitolare e Biblioteca – Integrated working project of 2° lot ARCIDIOCESI OF VERCELLI 1999 Official survey for structural work on the Piazza Italia 3/5 Vinovo garages, including static testing at projeect end ATC - TO 1999 Consulting service for Lingotto track restoration LINGOTTO 1999 Technical consulting service regarding building facades in Nichelino, Via Parri and Via Cacciatori, and in Moncalieri, Via Tetti Piatti ATC TORINO 3 CASE 1999 Project for contract work of a SSE in S. Benigno and Cabina TE in Settimo Torinese Architectural Project – struttural metric calculation (excluding reiforcements) ALSTOM 1999 Lingotto Multifunctional Centre – 3rd phase works - Pathè-Lingotto court – Assistance to structural testing for works in Lingotto S.p.A. and supervision, assistance to testing, works, architectural and finishing liquidation. LINGOTTO CINEMA E SVILUPPO S.P.A. 2000 Cable car Taormina-Letoianni, conclusive project civil works ING. SASCARO 2000 Torino Underground plant precast production facilities T.E.C. 2002 Biella Hospital Working project changes DE LIETO 2002 Creation of multi-purpose hall and parking lot in Bielmonte COMUNITA’ MONTANA 2003 “VALLE DI MOSSO” Volvera Municipality – Construction of three new premises for industrial and/or commercial purpose ABRATE S.r.l. Top station- Monte Bianco cableway in Helbronner – Nuovo Rifugio Torino SOCIETA' FUNIVIE 2006 MONTE BIANCO Construction work Sports Hall 1° lot COMUNE OF VILLAFRANCA PIEMONTE Gitto Abuja Tower CORONA NIGERIA 2007 Exterior fitting of "COCEA" warehouses in Taio PROVINCE AUTONOMA 2009 OF TRENTO Dakar Tower CORONA SENEGAL 2009 2006 2007 STUDIO CORONA 63 SPECIAL WORKS 64 DESCRIPTION CONTRACTOR YEAR S.S. n. 337 "in Val Vigezzo" - Branch: Unico Novara province – Urgent works for collapsed road reconstruction at Km. 9+850 ITINERA 1993 S.S. n. 142 "Biellese" – Urgent works for foundation structures reconstruction of two viaduct piers on river Cervo ABRATE 1993 S.S. n. 36 "Lago of Como e Spluga" Appraisal of urgent works for the static recovery of Monte Piazzo tunnel, between Km. 84+428 and Km. 84+451 I.B.C. 1994 Beams testing C.P.C. - Pian di Molo Porto Empedocle Viaduct (AG) C.P.C. 1994 S.S. n. 299 "Alagna" - Branch: Km. 40+000 Alagna - Novara Province – Urgent works for the construction of road surface works for protection from falling rocks at Km. 83+000 LAURO 1994 S.S. n. 113 "Settentrionale sicula" –Messina Province - Urgent works of extraordinary maintenance for the recovery and consolidation of the "Oliveri" bridge at Km. 61+900 VINCENZO VIRGA 1994 S.S. n. 631 "of Val Cannobina" - Branch: Unico – Urgent works for damage repair of state higway Km. 13+520 after floods of October 1992 LAURO 1994 Torino-Alessandria-Piacenza Motorway , concrete restoration works and protection of Andona viaduct Km. 27+202 from pier n. 11 to n. 14 LICIS 1994 S.S. n. 334 "of Sassello" – Urgent works road restoration at Km. 50+520 ALPE STRADE 1994 S.S. n. 190 "delle Solfare” - Riesi II Viaduct pier foundation restoration, subject to landslides – Practical integration 241/76 ANAS PALERMO 1994 Artificial tunnel COGEFA 1994 S.S. n. 24 "of Monginevro" – Damaged overpass restoration at Km. 49+100 COGEFA 1994 S.S. n. 334 "of Sassello" - Branch: AcquiSavona province border - Alessandria province – Urgent works for collapsed road restoration at Km. 50+200 execution of works by strenghtening and support IVALDI 1994 S.S. n. 142 "Biellese" - Urgent works for foundations of two pier structures consolidation of viaduct on river Cervo TREVI 1994 Novara province - S.P. “Riceno” – Landslide restoration works at 0+900 LAURO 1994 S.S. n. 23 "Colle del Sestriere" - Branch: Stupinigi - Cesana T.se -Torino Province Damage appraisal for urgent works on collapsed road at Km. 74+560 after floods in November 1994 ABRATE 1994 S.P. n. 4 "Baldissero" - Reconstruction of road between Km. 1+600: 1+800 - b) S.P. n. 117 "Cordova" Reconstruction of road between Km. 1+500 : 1+600 ABRATE 1994 Ivrea-Santhià Motorway – Completion of right wall consolidation from 14+461 to 14+900 ATIVA S.P.A. 1995 S.S. n. 9 "Via Emilia" - Lodi-Piacenza Branch Urgent work for consolidetaion and static recovery of pier n. 1-2 on Po river to Piacenza SICOP 1995 Torino-Piacenza Motorway - Lot: GoriaBaldichieri - via Cavour underpass Structural intervention work ITERSTRADE 1995 S.S. n. 458 "Casalborgone" – Bridge recovery work at Km. 6+900 damaged during the November 1994 floods SALGET 1995 S.S. n. 113 "Settentrionale Sicula" – Working project for urgent work for the recovery of a bridge seriously damaged, located in progr. Km. 89+450 VERSACI 1995 S.S. n. 190 "delle Solfare – Urgent extraordinary maintenance work for the consolidation of the a landslide between piers n. 23 and n. 25 of viaduct Riesi II at Km. 33,700 S. NICOLA 1995 S.S. n. 92 "dell'Appennino Meridionale" Urgent work project to reopen to traffic interrupted for a landslide between Km. 7+800 and 11+000 ROMANA SCAVI 1995 S.S. n. 23 "of Colle of Sestriere" – StupinigiCesana Torinese Branch – Urgent work for the consolidation of a road with landslide at Km.74+630 ABRATE 1995 Urgent work for the reconstruction of a road after the Belbo river floods between Km. 23+320 and Km. 23+510 LAURO 1995 S.S. n. 23 "Colle del Sestriere" - : StupinigiCesana Branch- Province of Torino Urgent work for the consolidation of a road with landslide at Km. 74+630 ABRATE 1995 S.S. n. 596 Dir. "dei Cairoli" - Urgent work project for the reconstruction of a bridge on the Roggia Stura in Terranova of Casale Monf. Collapsed after the November 1994 floods SALGET 1996 S.S. n. 142 "Biellese" – Consolidation work for piers 6-7-8 of viaduct on Cervo river LAURO 1996 S.S. n. 28 Dir. - Branch: Mondovì-CarrùBastia, Cuneo province - Urgent work for reconstruction of road safeguarding and strengthening works of bridge on river Tanaro to Km. 15+800 in Bastia Municipality PREVE COSTRUZIONI 1996 S.S. n. 23 "Colle del Sestriere" - Branch: Stupinigi-Cesana Torinese - Urgent work of restoration and strengthening of road in frana to Km.73+900 and 75+000 COGIBIT 1996 Province of Imperia S.S. n. 28 "Colle di Nava" - Branch: Ponte di Nava – Imperia Urgent work of plumbing system placement near of Valico pre-bored hole VIALIT 1997 S.S. n. 24 "Of Monginevro" - Landslide at Km.85+100 - Berlinese and counterscarp wall CONICOS 1997 S.S. n. 23 “Colle del Sestriere" – Branch Stupinigi-Cesana Torinese -Torino Province Perizia of Urgent work of rocky slopes strengthening and protection works against avalanches between Km. 100+400 and Km. 100+800 COGEFA 1998 65 SPECIAL WORKS DESCRIPTION CONTRACTOR YEAR Project to create plinths for plant Piobesi COGIBIT S.p.A. 2004 S.P. 12 "Fondovalle Tanaro" - Branch: Bastia-Lesegno - Works of road safety "Fondovalle Tanaro" INTERSTRADE S.p.A. 2004 Tunnel Pierremenaud – Partila coating detachment in tunnel SITAF S.p.A. 2004 Definitive and executive planning, 494/96 safety coordination , Construction management and assistance to maintenance operation tests needed for floor strengthening of old bridge on River Po against erosion COMUNE DI CASALE 2004 S.S. n° 28 "Colle di Nava" – Technical services for the study of stresses and deformation of Ceva bridge , designed to verify the acceptability of the item ANAS TORINO 2004 Strada Provinciale n. 210 - Branch: Bernezzo-Caraglio – Bridge on Grana, Study of external floor prestressing PROVINCE OF CUNEO 2005 Consulting service for the census of road bridges on S.S. 45 bis "Gardesana Occidentale" ANAS MILANO 2005 S.P. 29 – Preliminary design works of restoration of bridge on River Po near built-up area of Cardè PROVINCE OF CUNEO 2005 Works of completion II Lot Variant in Borgomanero - Viaduct on S.S. 32 Dir.: from SP1 to SP2 FRANCO S.p.A. 2005 Ex S.S. 30 "Valle Bormida" Restoration span of bridge on River Bormida, orographic left, to Km. 38+610 circa, in Terzo Municipality (TO) PROVINCIA DI ALESSANDRIA 2005 Via Po parking lot – Realization of underground garages in courtyard area in Via Sant'ottavio n° 5 - Torino ABRATE S.r.l. 2006 Realization of pedestrian and cycle bridge crossing on river Dora Baltea along area ex Montefibre – Historical City - Ivrea COMUNE DI IVREA 2007 Completion of protection and strenghtening works built-up area side and infrastructure in Taormina Municipality SASCARO ING. 2007 S.S. 337 "Valle Vigezzo" – Upgrading works by strengthening intervention and restoration of Ribellasca Bridge - Lot III ANAS TORINO 2008 Novara Province - Romagnano Sesia Municipality - S.R. n. 142 "Biellese" Extraordinary maintenance works on bridge on River Sesia LIS S.p.A. 2008 Strada Provinciale n° 29. Bridge on River Po at Cardè. Restoration works on bridge on river Po at built-up area in Cardè PROVINCE OF CUNEO 2009 Renovation works on mountain pass side exit Ramat and Cels tunnels (Bardonecchia side) – Feasibility study and definitive project for exchange of carriageway hypothesis(Cels tunnel - Deveys viaduct) MUSINET S.p.A. 2009 Project and consultancy for enlargement section of air intake for tunnel ventilation MUSINET S.p.A. 2010 ARCAS S.p.A. 2010 Interconnection Italy-France Connection HVDC 1000 MW – Terna MUSINET S.p.A. 2010 S.S. 626 "Valle of Salso" - Reconstruction and strengthening works of Geremia II viaduct placed at Km. 48+080 of S.S. 626 IMPRESA GENERALE COSTRUZIONI S.r.l. 2011 Project of structural works for the execution and of partial reconstruction and extraordinary maintenance of "Dardanelli" viaduct in Saint Rhémy-en- Bosses Municipality (Aosta). Dardanelli Viaduct STUDIO CORONA civil engineering STUDIO CORONA S.r.l. Corso Re umberto, 23 - Torino - Italia Tel.: +39 011 5627586 - Fax: +39 011 545739 www.coronasic.it e-mail: [email protected]