1°CONVEGNO The EBSF UCs

Transcript

1°CONVEGNO The EBSF UCs
1°CONVEGNO
Sistema
Gomma nel TPL
The EBSF UCs
Francesca Pico
Special Projects Manager – ASSTRA 23‐24 novembre 2011
Centro Congressi g
“La Fornace” Via dell’Equitazione 32, Roma
The goal of the EBSF UCs
The goal of the EBSF UCs
• The EBSF UCs are designed and executed as a combination of:
– demonstrator vehicles running in operational conditions
and – system/infrastructure features
GOAL
Produce practical, physical and measurable results to strengthen and prove the application of the “system approach” resulting in improved quality and efficiency of bus services in existing European cities.
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
The UCs deployment in the frame of the EBSF project
User Needs, KPIs and U
N d KPI
d
System Approach
Deployment of UCs and validation
d lid ti
Vehicle V
hi l
Implementation
Evaluation of project results
Use of Bus in Urban U
fB i U b
Environment
Vision and Recommendations Site specific and cross‐sites
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
Site: Bremerhaven
Population: ~114,800 (medium size)
Leader: Bremerhaven Bus
Associated manufacturer: EvoBus
IT industry partner: INIT
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 1: Bremerhaven
UC 1: Bremerhaven
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 1: Bremerhaven
UC 1: Bremerhaven
Objectives
• Seamless journey
• Better and high level of e‐public services
• Public perception
p
p
Main features
Multi modal information services (on and off board)
• linked to public information system (e‐public, tourism related services), and
• offering
ff i reall time
i
i f
information (arrival, depature, connecting
i ( i l d
i lines)
li )
1 demobus and 15 retrofitted buses
10 Info‐terminals
10 Info
terminals (4 with
(4 with double screens) at redesigned
screens) at redesigned bus stops
bus stops
Duration of the Trial: ~ 8/9 months (July 2011 – January/February 2012)
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
Site: Budapest
Population: ~1,815,000 (large size)
Leader: BKV Ltd
Associated manufacturer: MAN
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 2: Budapest
UC 2: Budapest
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 2: Budapest
UC 2: Budapest
Objectives
• Shorter journey time
•Passenger flow
•Safety
•Environment
Environment
•Remote maintenace
Main features
• High capacity bus with special seats arrangements and five doors for
b d / l h
boarding/alighting
operations
• On board communication architecture (information to passengers, tele‐
diagnostic and video‐surveillance)
g
)
• Implementation and evaluation of solutions and optimisation for energy savings
ffi light influence
li h i fl
ff priority
i i to the bus
h b
• Traffic
to offer
23-24 novembre 2011
Duration of the Trial: 9 monthsCentro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
Site: Madrid (Region)
Population: ~6,000,000 (large size)
Leader: CRTM
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 3: Madrid
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 3: Madrid
UC 3: Madrid
Objectives
j
•Passenger information
•Advanced traffic management
•Real
Real time multi modal
multi modal information
Testingg features
• Multimodal real time information to passengers (on board, at interchange/commuter stations by screens, on the web, via sms, bluetooth, ect )
ect.)
• Architecture able to combine and integrate different AVMS from different operators
• Underground vehicle location
30 retrofitted buses on 5 lines
Duration of the Trial: 6 months
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
Site: Rome
Population: ~2,700,000 (large size)
Leader: ATAC
Associated manufacturer: IRISBUS
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 4: Rome
UC 4: Rome
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 4: Rome
UC 4: Rome
Objectives
• Operational service efficiency improvement
• Decrease of maintenance costs and reliability • Improvement of buses availability rate
p
y
• Decrease of operational costs
• Driver working environment improvement
•
•
•
Testing features
Preventive diagnosis technologies and features for maintenance Internal layout/modularity
Driver cabin mock‐up
1 demobus and 50 retrofitted buses
Back office applications
Back office applications
Duration of the Trial: 12 months
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
Site: Gothenburg
Population: ~750,000 (large size)
Leader: VTAB
Associated manufacturer: VOLVO
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 5: Gothenburg
UC 5: Gothenburg
Visual guidance at stops
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 5: Gothenburg
UC 5: Gothenburg
Objectives
j
• New place for the driver
•Passenger accessibility
• Commercial speed
Commercial speed
•Passenger comfort
TTesting
ti features
f t
• Innovative internal bus design and layout • Centred driver cabin
Centred driver cabin
• Application of new training concepts for docking to stops and “smart driving”
• Development of guidance supporting systems
Duration of the Trial: 7/8 months
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
Site: Rouen
Population: ~533,000 (large size)
Leader: VERI
Associated manufacturer: IRISBUS
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 6: Rouen
UC 6: Rouen
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 6: Rouen
UC 6: Rouen
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 6: Rouen
UC 6: Rouen
Objectives
• Easy boarding/alighting of passengers
• Accurate docking
Testing features
Installation of Installation
of
o a gap filler equipment and o a system of electronic suspension (plus sensors and transponders) to remove both the horizontal and the vertical gap between dock and bus.
•
2 retrofitted buses and bus stops
Duration of the Trial: minimum 5 months
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Geographical Collocation, Cities Size, Leaders,
Associated Manufacturers and Main Features
Site: Brunoy
Population: ~25,000 (small size)
Leader: VERI
Associated manufacturer: IRISBUS
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 7: Brunoy
UC 7: Brunoy
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
UC 7: Brunoy
UC 7: Brunoy
Objectives
• Help for the identification of future interventions for maintenance
• Reduced time and costs of interventions
• Limited vehicle breakdowns during the service
• Improvement
I
t off the
th availability
il bilit off vehicles
hi l
TTesting
ti features
f t
• New maintenance and diagnosis methods based on the use of ICT by means of:
•specific on‐board equipment based on dedicated sensors for key components
(doors/batteries/brake)
•new predictive back‐office software around a standardized remote diagnostic
database
10 retrofitted buses (Citelis Euro IV)
back office application (wifi network in deport, etc)
23-24 novembre 2011
Centro Congressi - “La Fornace” , Roma
Duration of the Trial: ~ 12 months
1°CONVEGNO
Sistema
Gomma nel TPL
Thank you for your kind
attention
Francesca Pico
[email protected]
23‐24 novembre 2011
Centro Congressi “La
La Fornace
Fornace” Via dell’Equitazione 32, Roma