References - pre metal

Transcript

References - pre metal
References
Technologies in steel, transparencies and substance
Technologies in steel
transparencies
and substance
6Piquadro
35Intergross
INDUSTRIAL
SERVICE AND BUSINESS
11
39
Hotel Du Lac et Du Park
INDUSTRIAL
SERVICE AND BUSINESS
15
Hotel Lido Palace
41
Forum Galilei
SERVICE AND BUSINESS
SERVICE AND BUSINESS
CTE group spa
19Sait
45Pompea
INDUSTRIAL
SERVICE AND BUSINESS
23Area22
49Prisma
SERVICE AND BUSINESS
INDUSTRIAL
27
S. Maurizio
53
Cantina di Isera
SERVICE AND BUSINESS
SERVICE AND BUSINESS
31
X Bionic
55
Cassa Rurale
SERVICE AND BUSINESS
INDUSTRIAL
57Aquafil
79Zuani
INDUSTRIAL
SERVICE AND BUSINESS
59Riello
81
Cartiere del Garda
INDUSTRIAL
INDUSTRIAL
63Interservice
83
Tennis Brentonico
SERVICE AND BUSINESS
SPORT, ENTERTAINMENT, ART
67
Manifattura di Domodossola
85
Castel Mareccio
INDUSTRIAL
SPORT, ENTERTAINMENT, ART
71
BIC Center
87
Marangoni Meccanica
SERVICE AND BUSINESS
INDUSTRIAL
73
SIR Intercity
91Pama
SERVICE AND BUSINESS
INDUSTRIAL
77Brifin
95Cipriani
INDUSTRIAL
INDUSTRIAL
Piquadro
Realization of an industrial building site in Silla Sassuriano in the
town of Gaggio Montano - on Lot 1
Costruzione di un fabbricato industriale in frazione
Silla Località Sassuriano Comune di Gaggio Montano - sul Lotto 1
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Piqubo SpA, Gaggio Montano (BO), 2006
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Karim Azzabi
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA (steel), Ing. Giuseppe Monari (concrete)
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Studio Tecnico Associato Geom. Sergio Grazia ed Elenio Ricci
EXECUTION / INTERVENTI EFFETTUATI
Main steel structures, roofing, cladding, curtain walls, aluminum fixtures
and complementary works
Strutture portanti steel, coperture, tamponamenti, facciate continue
e serramenti in alluminio ed opere complementari
industrial
CTE group spa
Realisation of a new office building named “Minerbio 3”
as an extension of the existing industrial complex with inside
Effer Spa activities in the town of Minerbio (BO)
Costruzione di una nuova palazzina uffici denominata “Minerbio 3”
quale ampliamento dell’esistente complesso industriale ospitante le
attività di Effer spa nel comune di Minerbio (BO)
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
CTE group spa, Minerbio (BO), 2009 - 2010
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Studio Antonio Iascone - Ingegneri e Architetti
PROJECT STRUCTURES / PROGETTO STRUTTURE
Ing. Luca Turrini
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Studio Antonio Iascone - Ingegneri e Architetti e Premetal Spa
EXECUTION / INTERVENTI EFFETTUATI
A “turn-key” works
Lavori “chiavi in mano”
industrial
Hotel Lido Palace
Renovation and expansion of the building “Hotel Lido Palace”
in Riva del Garda (TN)
Intervento di ristrutturazione ed ampliamento dell’edificio
“Hotel Lido Palace” a Riva del Garda (TN)
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Hotel Lido SpA, Riva del Garda (TN), 2009 - 20110
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Alberto Cecchetto
PROJECT STRUCTURES / PROGETTO STRUTTURE
ATA Engineering SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
ATA Engineering SpA
service and business
EXECUTION / INTERVENTI EFFETTUATI
Metal-bearing structures, curtain walls, glass buildings and walls in Corten steel
Strutture metalliche portanti, facciate continue, costruzioni in vetro
e rivestimenti steel corten
Sait
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Sait. Soc Coop, Trento (TN), 2009
Realisation of a new office building and a new warehouse Sait
located near Interporto in Trento
Costruzione della nuova palazzina uffici e del nuovo magazzino Sait
in zona Interporto di Trento
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Mauro Degiampietro
PROJECT STRUCTURES / PROGETTO STRUTTURE
Ing. G. Flotta (Tecnopolis Soc. Coop)
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Tecnopolis Soc. Coop
service and business
EXECUTION / INTERVENTI EFFETTUATI
Main steel structures, curtain walls, architectural façade claddings and
complementary works
Realizzazione di strutture portanti steel, facciate continue,
rivestimenti architettonici di facciata ed opere accessorie
Area22
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Area22 Srl, Rovereto (TN), 2009
Realization of a new logistic center and business service
with annexed Hotel
Realizzazione di nuovo centro logistico
e servizi al commercio con annesso Hotel
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Enrico Ferreguti
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA (steel), Ing. Franco Detassis (concrete)
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Ing. Franco Detassis
service and business
EXECUTION / INTERVENTI EFFETTUATI
Main structures in mixed steel and prestressed reinforced concrete, curtain
walls, aluminium fixtures, architectural coatings and complementary works
Realizzazione di strutture portanti miste acciaio-c.a.p., facciate continue,
serramenti in alluminio, rivestimenti architettonici ed opere complementari
S. Maurizio
Works for the Training Center S.Maurizio in Bolzano
extract lots 2.5, 11 – Contract 2
Metal works - MORITZING METALL 2004
Lavori per il centro di Formazione S. Maurizio di Bolzano
stralcio lotti 2,5, 11 - Appalto 2
Opere in metallo – MORITZING METALL 2004
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Provincia di Bolzano, Bolzano, 2006
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch.Carlo Azzolini
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA (steel)
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Arch.Carlo Azzolini
service and business
EXECUTION / INTERVENTI EFFETTUATI
Metal structural works, curtain walls and aluminium fixtures, zenith roofing,
glazier and locksmith works
Carpenterie metalliche, facciate continue e serramenti
in alluminio, coperture zenitali, opere da vetraio e da fabbro
X Bionic
New office building, new technology development center
and auditorium in Cristina srl industrial complex
Nuovo edificio direzionale, centro sviluppo nuove tecnologie
ed auditorium presso il complesso industriale Cristina srl
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Cristina Srl, Asola (MN), 2009-2010
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Santo Denti
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal Spa
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Pre metal Spa
EXECUTION / INTERVENTI EFFETTUATI
Steel structures, coverings and facing, courtain wall and architectural coatings,
finishing works
Realizzazione di strutture in acciaio, tamponamenti e coperture, facciate
continue e rivestimenti architettonici, opere di completamento
industrial
Intergross
Realization of a logistic complex named “Comparto 6” located
in the area Interporto in Trento
Realizzazione del complesso logistico “Comparto 6”
in località Interporto di Trento
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Intergross Soc. Consortile ARL, Trento, 2008
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Theofanis Bobotis
PROJECT STRUCTURES / PROGETTO STRUTTURE
Ing. Roberto Boller
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Ing. Franco Detassis
service and business
EXECUTION / INTERVENTI EFFETTUATI
Main steel structures, roofing, curtain walls and aluminium fixtures,
architectural coatings and complementary works
Strutture portanti steel, coperture, tamponamenti, facciate continue
e serramenti in alluminio,rivestimenti architettonici ed opere complementari
Hotel Du Lac
et Du Park
New complex Murialdo
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Hotel Du Lac et Du Parc SpA, Riva del Garda (TN), 2007
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Spatium - Arch. Lorenzo Carmellini
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Costruzione di nuovo complesso alberghiero “Murialdo”
Studio Planning - Ing.Massimo Festi
EXECUTION / INTERVENTI EFFETTUATI
Curtain walls, entrances, sliding doors, windows, facade claddings
Facciate continue e serramenti in alluminio,
sistemi oscuranti ed opere complementari
service and business
Forum Galilei
New business and commercial center
Nuovo centro direzionale e commerciale “Galilei”
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Agri SpA, Bolzano, 2005
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Studio A.i.g. - Ing. Stefano Mattei, Arch. Cristian Paganini
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Studio A.i.g.- Ing. Stefano Mattei
EXECUTION / INTERVENTI EFFETTUATI
Curtain Walls and aluminium fixtures, zenith roofing, façade claddings
and works by glazier
Facciate continue e serramenti in alluminio, rivestimenti di facciata,
cuperture zenitali, opere complementari
service and business
Pompea
Realization of an office building in the new industrial complex
Costruzione di palazzina uffici nel nuovo complesso industriale
sede “Pompea”
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Pompea SpA, Medole (MN), 2002
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Massimo Giacomazzi
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA (steel)
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Pre metal SpA
EXECUTION / INTERVENTI EFFETTUATI
Main steel structures, curtain walls and aluminium fixtures,
complementary works
Strutture portanti steel, facciate continue
e serramenti in allumnio, opere complementari
industrial
Prisma
Realization of a new office building and redevelopment of the
existing one
Costruzione di nuova palazzina uffici
e ristrutturazione della esistente sede “Prisma”
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Prisma SpA, Colognola ai Colli (VR), 2002
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Contec Srl
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Contec Srl
EXECUTION / INTERVENTI EFFETTUATI
Curtain walls and aluminium fixtures, zenith roofing, Alucobond cladding,
complementary works
Facciate continue e serramenti in alluminio, coperture zenitali,
rivestimenti in alucobond, opere complementari
industrial
Cantina di Isera
Renovation of “Cantina Sociale Isera”
Ristrutturazione della Cantina Sociale di Isera
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Cantina Sociale di Isera società cooperativa, Isera (TN), 2007
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Masterplan Studio - Arch. Claudio Poli
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Arch. Poli - Pre metal SpA
service and business
EXECUTION / INTERVENTI EFFETTUATI
Steel structures, curtain walls, steel windows, roofing, façade coatings,
complementary works
Strutture steel, facciate continue e serramenti steel,
coperture, rivestimenti di facciata, opere complementari
Cassa Rurale
Renovation of the facade of Cassa Rurale in Rovereto
Ristrutturazione delle facciate della sede
della Cassa Rurale di Rovereto
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Cassa Rurale di Rovereto, Rovereto (TN), 1999
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Ruffo Wolf
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Arch. Ruffo Wolf
EXECUTION / INTERVENTI EFFETTUATI
Curtain walls and aluminium fixtures, steel and stone cladding panels
Facciate continue e serramenti in alluminio, rivestimenti in pannelli inox e pietra
service and business
Aquafil
Realization of an office building in the industrial complex Aquafil
Costruzione di palazzina uffici nel complesso industriale “Aquafil”
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Aquafil SpA, Arco (TN), 1996
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Aquafil SpA
PROJECT STRUCTURES / PROGETTO STRUTTURE
Ing. Sergio Azzolini
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Pre metal SpA
EXECUTION / INTERVENTI EFFETTUATI
Main steel structures and curtain walls
Strutture portanti steel e facciate continue
industrial
Riello
Realization of a new production complex
Costruzione di nuovo complesso produttivo “Riello”
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Riello SpA, Legnago (VR), 1°lotto 1998 - 2° lotto 2003
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Contec Srl - Arch. Ludovico Scodellari
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Contec Srl - Arch. Ludovico Scodellari
EXECUTION / INTERVENTI EFFETTUATI
Curtain walls and aluminum fixture, zenith roofing, Alucobond cladding,
complementary works
Facciate continue e serramenti in alluminio, coperture zenitali,
rivestimenti in alucobond, opere complementari
industrial
Interservice
Realisation of a new commercial vehicles multibrand workshop
“Interservice”, located near Interporto in Trento
Costruzione della nuova officina multimarche veicoli commerciali
“Interservice” in zona Interporto di Trento
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Interservice srl, Trento (TN), 2008 - 2009
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Studio Pallaoro & Balzan
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Ing. Danilo Balzan e Pre metal SpA
service and business
EXECUTION / INTERVENTI EFFETTUATI
Metal structures, fire doors, metal fixtures, metal façade claddings,
works by glaziers
Opere di carpenteria metallica, porte tagliafuoco, serramenti
e rivestimenti metallici di facciata ed opere da vetraio
Manifattura
di Domodossola
Realization of a new plant consisting in a productive
and office building
Realizzazione di nuovo insediamento industriale
costituito da un edificio produttivo e palazzina uffici
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Immobiliare Domo S.p.A., Villadossola (VB), 2008
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Ing. F. Brambati e Pre metal SpA
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Pre metal SpA
EXECUTION / INTERVENTI EFFETTUATI
A “turn-key” work
Realizzazione completa opere prefabbricate “chiavi in mano”
industrial
BIC Center
Realization of a modular building for industrial use for the
extension of the BIC Center in Rovereto
Realizzazione di un edificio modulare ad uso industriale
per l’ampliamento del Centro B.I.C. di Rovereto
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Agenzia per lo Sviluppo SpA, Rovereto (TN), 2006
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Ruffo Wolf
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA (steel)
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Arch. Ruffo Wolf
service and business
EXECUTION / INTERVENTI EFFETTUATI
Main structures in mixed steel and prestressed reinforced concrete, windows
Strutture portanti miste acciaio-c.a.p., opere da serramentista
SIR Intercity
Realization of a multi-storey residential-commercial complex
Costruzione di un complesso residenziale-commerciale
pluripiano
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
S.I.R. Srl, Rovereto (TN), 2004
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Renato Fornaciari
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Pre metal SpA
service and business
EXECUTION / INTERVENTI EFFETTUATI
A “turn-key” work
Realizzazione completa palazzo commerciale con formula “chiavi in mano”,
strutture steel coperture palazzi residenziali
Brifin
New industrial plant with annexed an office building
Nuovo stabilimento industriale con annessa palazzina servizi
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Brifin SpA, Rovereto (TN), 2007
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Andrea Galvagni
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Arch. Andrea Galvagni
EXECUTION / INTERVENTI EFFETTUATI
Metal structural works, aluminum fixtures and coatings
and complementary works
Opere in carpenteria metallica, serramenti, rivestimenti in Alucobond
ed opere di completamento
industrial
Zuani
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Zuani Immobiliare Srl, Rovereto (TN), 2008
Building elevation for extension offices
Sopraelevazione e riqualificazione architettonica
di palazzina uffici
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Brunella e geom. Paolo Avi
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Arch. Brunella e geom. Paolo Avi
service and business
EXECUTION / INTERVENTI EFFETTUATI
Metal works, roofing, facade claddings, entrance shed,
stairs and internal finishings
Realizzazione completa formula “chiavi in mano”
Cartiere del Garda
Cladding works in prefabricated metal elements
Riqualificazione del complesso industriale “Cartiera del Garda”
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Cartiere del Garda SpA, Riva del Garda (TN), 2004
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Studio Plan - Arch. Giorgio Losi
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Pre metal SpA
EXECUTION / INTERVENTI EFFETTUATI
Metal structural works, coating with aluminium panels, roofing, sunscreen
Carpenterie metalliche, rivestimento in pannelli di alluminio,
coperture, frangisole
industrial
Tennis Brentonico
Realization of a sports facilities for indoor tennis
in site “Al Zengio”
Costruzione di impianto sportivo per tennis coperto
in Loc. “Al Zengio”
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Comune di Brentonico, Brentonico (TN), 2000
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Ing. Giulio Andreolli
PROJECT STRUCTURES / PROGETTO STRUTTURE
Ing. Germano Barberi - Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Ing. Giulio Andreolli
sport entertainment art
EXECUTION / INTERVENTI EFFETTUATI
A “turn-key” work
Realizzazione completa formula “chiavi in mano”
Castel Mareccio
Realization of a temporary coverage of the courtyard
of “Castel Mareccio”
Realizzazione della copertura temporanea della corte
di Castel Mareccio
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Comune di Bolzano, Bolzano, 2006
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Valentino Andriolo
PROJECT STRUCTURES / PROGETTO STRUTTURE
Ing. Adriano Ferro
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Arch. Valentino Andriolo
sport entertainment art
EXECUTION / INTERVENTI EFFETTUATI
A “Turn-key” work
Strutture steel inox, serramenti in alluminio,
copertura in policarbonato, sistemi di oscuramento
Marangoni
Meccanica
New prefabricated metal industrial building
with integrated an office building
Nuovo capannone industriale prefabbricato metallico
con palazzina uffici integrata
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Marangoni Meccanica SpA, Rovereto (TN), 2009
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Renato Fornaciari
PROJECT STRUCTURES / PROGETTO STRUTTURE
Ing. Vincenzo Naldi
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Ing. Vincenzo Naldi - Pre metal SpA
EXECUTION / INTERVENTI EFFETTUATI
A “turn-key” work
Realizzazione completa formula “chiavi in mano”
industrial
Pama
Expansion of the industrial plant and realization
of a new office building
Ampliamento dello stabilimento industriali
e realizzazione di nuova palazzina uffici
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Pama SpA, Rovereto (TN), 2006
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Studio d’Architettura A.Galvagni & T.Gelmini
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTION / INTERVENTI EFFETTUATI
Metal structural works, roofings, skylights, coatings
and external and internal windows
Carpenteria metallica, coperture, lucernari, rivestimenti
e serramenti interni ed esterni
industrial
Cipriani
New productive building with annexed office building
Costruzione di stabilimento industriale con annessa palazzina uffici
CLIENT, CITY, YEAR OF BUILD / COMMITTENTE, COMUNE, ANNO DI COSTRUZIONE
Cipriani Srl, Rovereto (TN), 2001
ARCHITECTURAL DESIGN / PROGETTO ARCHITETTONICO
Arch. Michele Bertagnolli
PROJECT STRUCTURES / PROGETTO STRUTTURE
Pre metal SpA
EXECUTIVE PROJECT / PROGETTO ESECUTIVO
Pre metal SpA
EXECUTION / INTERVENTI EFFETTUATI
A “turn-key” work
Realizzazione completa formula “chiavi in mano”
industrial
HEADQUARTER via Fornaci, 70 - 38068 Rovereto (TN) ITALY
Phone +39 0464 434443 - Fax +39 0464 436665
e-mail [email protected]